My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
4_CWU Tech Transfer Agenda 20260519
>
Meetings
>
2026
>
05. May
>
2026-05-19 10:00 AM - Commissioners' Agenda
>
4_CWU Tech Transfer Agenda 20260519
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/14/2026 12:04:51 PM
Creation date
5/14/2026 12:03:42 PM
Metadata
Fields
Template:
Meeting
Date
5/19/2026
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Item
Request to Approve a Resolution to Adopt the CWU Technology Transfer Center Feasibility Study, Capital Stacking Plan and Grant Support Documents
Order
10
Placement
Consent Agenda
Row ID
144485
Type
Resolution
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
99
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
46 | Old Heat CERB Feasibility Study <br />1200 S Canyon Road in Ellensburg, WA <br />$2,300,000 <br />This property is situated on 1.46 acres within the city’s Commercial Highway <br />zoning district and features a substantial 14,000 square foot building with ample <br />paved parking. Its strategic location directly on Canyon Road, Ellensburg’s <br />primary retail corridor, places it between established automotive businesses, Les <br />Schwab and Windy Chevrolet, and offers direct street frontage on both Canyon <br />Road and Ruby Street. The property is relatively accessible, with a sidewalk <br />providing pedestrian access and proximity of approximately 0.2 miles to the <br />nearest bus stop and 0.3 miles to Central Washington University. Environmental <br />assessments have indicated no identified issues with the property. <br />However, despite these attributes, the suitability of this location for the proposed <br />community building is subject to considerable disadvantages. The property’s <br />immediate adjacency to one of Ellensburg’s highest traffic volume thoroughfares, <br />most especially being located a half mile away from the western Interstate-90 <br />interchange, and its position within a predominantly transient commercial zone <br />could significantly detract from the desired quiet atmosphere. <br />The adjacent property uses, specifically a vehicle dealership and auto repair <br />shop, are fundamentally incompatible with fostering increased pedestrian <br />traffic and creating a welcoming, neighborhood-oriented environment. While <br />the existing structure offers substantial square footage, its prior use as a <br />dealership overflow and general retail space may necessitate extensive and <br />costly retrofitting to meet the diverse functional requirements and accessibility <br />standards of a modern community facility.3 <br />Exhibit 5: Canyon Rd <br />Image Credit: Loopnet
The URL can be used to link to this page
Your browser does not support the video tag.