My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2026-04-27-minutes-ec-study-session
>
Meetings
>
2026
>
05. May
>
2026-05-19 10:00 AM - Commissioners' Agenda
>
2026-04-27-minutes-ec-study-session
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/14/2026 12:05:51 PM
Creation date
5/14/2026 12:03:21 PM
Metadata
Fields
Template:
Meeting
Date
5/19/2026
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Item
Approve Minutes
Order
1
Placement
Consent Agenda
Row ID
144485
Type
Minutes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Docusign Envelope ID: ABE14BF3-B233-8618-81 FB-5120F8B0490C <br />REQUEST FOR PROPOSAL NO: 07 <br />Project Name: Ellensburg Rodeo Arena Completion <br />Owner: Kittitas County <br />Contractor: Cascade Central Construction <br />Job Number: 2025-009 <br />Page 1 of 5 <br />/_\L5 <br />SPOKANE <br />203 N Washington <br />Suite 400 <br />Spokane, WA <br />99201 <br />a 509.838.8568 <br />al search itects.com <br />TO: Cascade Central Construction, Contractor, please furnish your proposal for performing the changes outlined <br />below and/or detailed on the attachments referred to: <br />E-103 — OVERALL PLAN — BEHIND THE CHUTES — FLOOR PLAN — ELECTRICAL, <br />DELETED: (2)5-20R Duplex Receptacles and associated circuit callouts located at the FOH/MIX <br />portable riser position. <br />ADDED: (1)14-50R Simplex Receptacle where the (2)Duplex Receptacles were deleted and added <br />callout to read, "14-50R" and circuits, "25,27,29". <br />ADDED: (1)Equipment Tag labeled, "BC-1 " at the northwest corner of the southwest restrooms. <br />E-601 —SCHEDULES— ELECTRICAL, <br />PANEL L1 M SCHEDULE: <br />REVISED: Circuits 38,40,42, to be protected by 313-60A circuit breaker and description to read, "Beer <br />Cooler BC-1, Stage" with a load of 6000 VA for each phase. <br />PANEL L3A SCHEDULE: <br />• REVISED: Circuits 25,27,29, to be protected by 3P-50A circuit breaker and description to read, <br />"Receptacle, 14-50R, FOH/MIX" with a load of 3000 VA for each phase. <br />E-602 — SCHEDULES — ELECTRICAL, <br />BAR EQUIPMENT SCHEDULE —SCHEDULE: <br />ADDED: Equipment Item, "BC-1" with associated disconnect, fuse, and branch circuit feeder as shown <br />on attached E-602 markup. <br />ALSC Architects, P.S. By Todd Keller Date: 2/24/26 <br />PROPOSAL: <br />To the Owner: We propose to perform all changes described in the above request for a total ADDITION/46946+B,M- <br />(cross out one) to the contract sum of: <br />Seven Thousand Two Hundred Seventeen and 91/100 Dollars s 7.217.91 <br />(not including Sales Tax) <br />We have attached cost estimate detail sheets, and the foregoing amount covers all direct and indirect costs related to <br />this proposal and to the effect of the proposal on the remainder of the project. All other provisions of the contract <br />remain in full force and effect. We request the completion date be EXTENDED/REDUCED (cross one out) 0 <br />calendar days because of this work. The Contractor agrees to be bound to this proposal quotation for sixty (60) days <br />after this date. <br />ALSC Architects 11 We bring our clients' stories to life. <br />
The URL can be used to link to this page
Your browser does not support the video tag.