Laserfiche WebLink
& METAL FABNATION <br />Change Order Form # 3 PO/CO: Ellensburg Rodeo <br />I authorize Cascade Powder Coatingto perform the following work: <br />Job/Customer Name: Ellensburg Rodeo / Cascade Central Construction <br />Description of work added or changed: Changes for the East Side Ramp and the West Side Ramp <br />Materials: Adding 3/8" (.0675" O.D.) pickets to both ramps. <br />Powder Coating: Y/N Interior Exterior Specific Color Code: Primer and Flat Black (BK109) <br />Quoted Price for change requested: Adding $13,550.00 to the east side ramp and $14,900.00 to the west side <br />ramp, for an increase of $28,450.00 for both ramps. <br />Submitted By: Shane Dressel (Please Print) <br />Signature: Aamz 0ke44zZ <br />Date: 3-30-2026 <br />Approved By: (Please Print) <br />Signature: <br />Date: <br />