My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
G - Fully Executed
>
Meetings
>
2026
>
05. May
>
2026-05-05 10:00 AM - Commissioners' Agenda
>
G - Fully Executed
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/12/2026 12:38:45 PM
Creation date
5/12/2026 12:38:36 PM
Metadata
Fields
Template:
Meeting
Date
5/5/2026
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Fully Executed Version
Supplemental fields
Item
Request to Approve a Resolution to Authorize the Chair's Signature on Task Order No. 3 with Ardurra Group, Inc. for the Hungry Junction Road Project
Order
7
Placement
Consent Agenda
Row ID
144005
Type
Resolution
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Transportation On-Gall Ardurra Group, Inc. <br />project does not currently have an identified right of way phase, however right of way <br />work may be required. lt is anticipated that the Ardurra team will identify areas of <br />concern and work with the county to identify a solution which might consist of a right of <br />way phase, retaining walls, or both. A design objective will be to design right of way <br />needs "out of the project" as much as possible. <br />This scope of work does not include right of way acquisition or related tasks. However, <br />Ardurra will generate proposed right of way, easement, and temporary construction <br />easement line work, produce figures for property owner meetings, and attend property <br />owner meetings as needed (Up to 6). lt is assumed that property owner meetings will <br />be led by the county. <br />Proiect Approach: <br />Ardurra's general approach for the following scope of work will include: <br />lndependently re-establishing the 60% design using the county's 60% as a basis. <br />Effectively this means re-doing the work that's been done by the county from 30% to <br />60o/o. <br />The new iteration of the 60% design will verify the county's assumptions and design <br />intent, identify new ways to optimize the design, verify the extents of right of way <br />challenges, and identify solutions to be implemented in subsequent design submittals. <br />Typical 9Oo/o,100o/u and Bid Document design submittal iterations will proceed after re- <br />establishing the 60%. <br />A management reserve has been included in the scope of work to provide for currently <br />unidentified project needs including but not limited to additional civil design not already identified <br />below, right-of-way services, geotechnical design, structural design, or other <br />consultanVsubconsultant design needs. The following is Ardurra's specific scope of services. <br />a <br />a <br />a <br />Page 4 of 10
The URL can be used to link to this page
Your browser does not support the video tag.