Laserfiche WebLink
GENERAL NOTES <br /> 1. ALL WORK SHALL BE IN CONFORMANCE WITH KITTITAS COUNTY PUBLIC WORKS 16. THE DRAWINGS INDICATE LOCATIONS,DIMENSIONS,REFERENCES,AND 10. INSPECT ON A REGULAR BASIS(AT A MINIMUM WEEKLY,AND DAILY 7. AREAS DISTURBED OR DAMAGED BY CONSTRUCTION ACTIVITIES SHALL BE <br /> STANDARDS AND REQUIREMENTS.MATERIALS SHALL BE IN CONFORMANCE TYPICAL DETAILS OF CONSTRUCTION. THE DRAWINGS DO NOT INDICATE EVERY DURING/AFTER A RUNOFF PRODUCING STORM EVENT)AND MAINTAIN ALL RESTORED TO ORIGINAL CONDITIONS OR BETTER,TO THE SATISFACTION OF <br /> WITH THE LATEST EDITION OF THE WASHINGTON STATE DEPARTMENT OF CONDITION. WORK NOT FULLY DETAILED SHALL BE OF CONSTRUCTION SIMILAR EROSION AND SEDIMENT CONTROL BMPS TO ENSURE SUCCESSFUL KITTITAS COUNTY PUBLIC WORKS. THE CONTRACTOR IS RESPONSIBLE FOR <br /> TRANSPORTATION STANDARD SPECIFICATIONS. TO PARTS THAT ARE FULLY DETAILED. PERFORMANCE OF THE BMPS. DOCUMENTING CONDITIONS PRIOR TO CONSTRUCTION ACTIVITIES AND ANY <br /> DAMAGE THAT MAY OCCUR. <br /> 2. NO REVISIONS SHALL BE MADE TO THESE PLANS WITHOUT THE APPROVAL OF 17. THE CONTRACTOR SHALL HAVE THE APPROPRIATE LICENSES TO PERFORM THE 11. REMOVE TEMPORARY ESC BMPS WITHIN 30 DAYS AFTER THE TEMPORARY <br /> THE ENGINEER.ALL PROPOSED REVISIONS SHALL BE SUBMITTED BY THE SPECIFIED WORK. BMPS ARE NO LONGER NEEDED.PERMANENTLY STABILIZE AREAS THAT ARE 8. REMOVE DEMOLITION WASTE MATERIALS AND DEBRIS FROM PROJECT SITE AND <br /> ENGINEER OF RECORD FOR REVIEW AND APPROVAL BY THE KITTITAS COUNTY DISTURBED DURING THE REMOVAL PROCESS. LEGALLY DISPOSE OF THEM IN AN EPA-APPROVED LANDFILL ACCEPTABLE TO <br /> KITTITAS COUNTY PUBLIC WORKS. <br /> PUBLIC WORKS. EROSION&SEDIMENT CONTROL NOTES <br /> 12. PROVIDE TEMPORARY EROSION AND SEDIMENTATION CONTROL MEASURES TO <br /> 3. ALL SAFETY STANDARDS AND REQUIREMENTS SHALL BE THE RESPONSIBILITY 1. THE FOLLOWING CONSTRUCTION SEQUENCE IS RECOMMENDED AS A PREVENT SOIL EROSION AND DISCHARGE OF SOIL-BEARING WATER RUNOFF OR EARTHWORK&GRADING NOTES <br /> OF THE CONTRACTOR AND COMPLIED WITH AS SET FORTH BY OSHA. GUIDELINE IN ORDER TO BEST MINIMIZE THE POTENTIAL FOR EROSION AND AIRBORNE DUST TO ADJACENT PROPERTIES,ACCORDING TO REQUIREMENTS <br /> SEDIMENTATION CONTROL PROBLEMS: OF AUTHORITIES HAVING JURISDICTION. THE CONTRACTOR SHALL COMPLY 1. THE CONTRACTOR SHALL INSURE THAT TEMPORARY SLOPES ARE STABLE AND <br /> 4. EXISTING UTILITIES SHALL BE LOCATED BY CONTACTING CALL BEFORE YOU DIG a) CLEAR AND GRUB SUFFICIENTLY FOR INSTALLATION OF TEMPORARY WITH ALL REQUIREMENTS FOR STORM WATER DISCHARGE ASSOCIATED WITH APPROPRIATE EROSION CONTROL MEASURES ARE IN PLACE AND MAINTAINED. <br /> AT 811,AT LEAST 48 HOURS PRIOR TO STARTING ANY EXCAVATIONS.THE EROSION AND SEDIMENT CONTROL(ESC)BEST MANAGEMENT PRACTICE CONSTRUCTION ACTIVITY,INCLUDING OBTAINING THE APPROPRIATE PERMITS <br /> CONTRACTOR SHALL NOTIFY THE APPROPRIATE UTILITY COMPANIES PRIOR TO MEASURES(BMPS); AND APPROVALS. 2. GROUNDWATER OR UNANTICIPATED GEOLOGIC CONDITIONS SHALL BE <br /> STARTING WORK NEAR ANY FACILITIES AND SHALL COORDINATE THEIR WORK b) INSTALL TEMPORARY ESC BMPS,CONSTRUCTING SEDIMENT TRAPPING REPORTED TO KITTITAS COUNTY PUBLIC WORKS FOR ASSESSMENT AND <br /> WITH COMPANY REPRESENTATIVES. BMPS AS ONE OF THE FIRST STEPS PRIOR TO GRADING; 13. EROSION CONTROL MEASURES IN ADDITION TO THOSE INDICATED AS PART OF RECOMMENDATIONS. <br /> c) CLEAR,GRUB AND ROUGH GRADE FOR ROADS,TEMPORARY ACCESS THIS PLAN MAY BE REQUIRED DUE TO UNFORESEEN CONDITIONS,IF THE <br /> 5. WORK SHALL NOT BEGIN UNTIL THE APPROPRIATE PERMITS ARE OBTAINED AND POINTS AND UTILITY LOCATIONS; MEASURES DO NOT FUNCTION AS INTENDED,OR IF THE AUTHORITIES HAVING 3. ALL MASS GRADING AND COMPACTION EFFORTS SHALL BE PERFORMED IN <br /> NOTICE TO PROCEED IS ISSUED BY KITTITAS COUNTY PUBLIC WORKS. d) STABILIZE ROADWAY APPROACHES AND TEMPORARY ACCESS POINTS JURISDICTION DETERMINE INDICATED MEASURES ARE INADEQUATE. ACCORDANCE WITH THE PROJECT SPECIFICATIONS AND THE PROJECT <br /> WITH THE APPROPRIATE CONSTRUCTION ENTRY BMP; GEOTECHNICAL REPORT.COORDINATE MONITORING AND TESTING <br /> 6. THE CONTRACTOR SHALL NOTIFY KITTITAS COUNTY PUBLIC WORKS AT LEAST e) CLEAR,GRUB AND GRADE SUBJECT SITE; 14. FILTER FENCE SHALL BE USED TO AID IN CONTAINING ANY SEDIMENT ON THE REQUIREMENTS WITH KITTITAS COUNTY PUBLIC WORKS. <br /> 48 HOURS PRIOR TO STARTING WORK OR PROCEEDING WITH NEW PHASES OF f) TEMPORARILY STABILIZE,THROUGH RE-VEGETATION OR OTHER SITE DURING CONSTRUCTION. THE CONTRACTOR SHALL KEEP THE AREAS <br /> CONSTRUCTION.ALL INSPECTIONS SHALL BE SCHEDULED WITH A MINIMUM APPROPRIATE BMPS,SUBJECT SITE IN SITUATIONS WHERE SUBSTANTIAL ADJACENT TO THE SITE INCLUDING ROADWAYS FREE FROM DEBRIS. REFER TO 4. FILLS SHALL CONSIST OF WELL GRADED SANDS AND GRAVELS,WITH A <br /> 24-HOUR NOTICE PRIOR TO TESTING. CUT OR FILL SLOPES ARE A RESULT OF THE SITE GRADING; THE EROSION AND SEDIMENT CONTROL MEASURE DETAILS FOR ADDITIONAL MAXIMUM PARTICLE SIZE OF SIX INCHES,AND NO MORE THAN 20%PASSING <br /> g) CONSTRUCT ROADS,BUILDINGS,PERMANENT STORMWATER FACILITIES INFORMATION. THE NO.200 SIEVE. <br /> 7. AN APPROVED SET OF IMPROVEMENT PLANS SHALL BE KEPT ON THE JOB SITE (I.E.INLETS,PONDS,UIC FACILITIES,ETC.); <br /> AT ALL TIMES. h) PROTECT ALL PERMANENT STORMWATER FACILITIES UTILIZING THE 15. PROVIDE A DESIGNATED,POSTED CONCRETE WASHOUT AREA. THE CONCRETE 5. BOULDERS AND COBBLES GREATER THAN 6 INCHES APPEARING IN THE <br /> APPROPRIATE BMPS; WASHOUT SHALL NOT BE ALLOWED TO DRAIN OFF THE SITE OR INTO ANY EXCAVATION TO A DEPTH OF AT LEAST 4 INCHES BELOW SUBGRADE SHALL BE <br /> 8. THE CONTRACTOR SHALL MAINTAIN THE ROADS AND ALL OTHER PUBLIC 1) INSTALL PERMANENT ESC CONTROLS,WHEN APPLICABLE;AND, EXISTING OR FUTURE STORM DRAINAGE FACILITIES. HARDENED CONCRETE REMOVED. <br /> RIGHTS-OF-WAY IN A CLEAN,SAFE AND USEABLE CONDITION.ALL SOIL,ROCK, j) REMOVE TEMPORARY ESC CONTROLS WHEN: WASHOUT SHALL BE BROKEN UP AND REMOVED FROM THE SITE. <br /> OR CONSTRUCTION DEBRIS SHALL BE PROMPTLY REMOVED FROM THE L PERMANENT ESC CONTROLS,WHEN APPLICABLE,HAVE BEEN 6. ALL FILL MATERIAL SHALL BE DRIED MOISTENED <br /> PUBLICLY OWNED PROPERTY DURING CONSTRUCTION,AND UPON COMPLETION COMPLETELY INSTALLED; 16. LITTER,CONSTRUCTION DEBRIS,AND CONSTRUCTION CHEMICALS THAT COULD OPTIMUM MOISTURE,PRIOR TO PLACEMENT.LIFTS SHALL NOT EXCEED EIGHT <br /> TO WITHIN 2%OF THE <br /> OF THE PROJECT.ALL ADJACENT PROPERTY;PRIVATE OR PUBLIC,SHALL BE ii. ALL LAND-DISTURBING ACTIVITIES THAT HAVE THE POTENTIAL TO BE EXPOSED O STORM WATER MUST BE PREVENTED FROM BECOMING A INCHES.ALL FILL SHALL BE COMPACTED TO AT LEAST 90 2 IN MODIFIED <br /> MAINTAINED IN A CLEAN,SAFE AND USEABLE CONDITION. CAUSE EROSION OR SEDIMENTATION PROBLEMS HAVE CEASED,AND, POLLUTANT SOURCE IN STORM WATER DISCHARGES. PROCTOR(PRIS D OMP CTEDAASHTO T-1% WITH THE TOP 12 INCHES WITHIN THE <br /> iii.VEGETATION HAS BEEN ESTABLISHED IN THE AREAS NOTED AS ROADWAY PRISM COMPACTED TO 95%OF THE MODIFIED PROCTOR. <br /> 9. EXISTING PROPERTY CORNERS OR SURVEY MONUMENTS SHALL BE REQUIRING VEGETATION ON THE ACCEPTED ESC PLAN ON FILE WITH 17. APPLY CONSTRUCTION <br /> LAND SEED MIX TO ALL SOILS EXPOSED OR DISTURBED BY <br /> PROTECTED DURING CONSTRUCTION.ANY DAMAGED OR OBLITERATED THE LOCAL JURISDICTION. CONSTRUCTION ACTIVITIES.THE DISTURBED AREAS SHALL BE INCLUDING <br /> WO D 7. EMBANKMENTS SHALL NOT BE CONSTRUCTED ON FROZEN OR SNOW-COVERED <br /> CORNERS OR MONUMENTS SHALL BE RE-ESTABLISHED BY A PROFESSIONAL USING A STANDARD HYDROSEED APPLICATION PER WSDOT,INCLUDING WOOD FOUNDATIONS,OR WITH THE USE OF FROZEN MATERIALS. <br /> SURVEYOR,LICENSED TO WORK IN THE STATE OF WASHINGTON,AT THE 2. RESTORE CONSTRUCTION ACCESS ROUTE EQUAL TO OR BETTER THAN THE FIBER MULCH,GUAR GUM TACKIFIER,AND SLOW RELEASE FERTILIZER.PRIOR <br /> CONTRACTOR'S EXPENSE. PRE-CONSTRUCTION CONDITION. TO APPLYING THE HYDROSEED,THE CONTRACTOR SHALL VERTICAL TRACK 8. EMBANKMENTS CONSTRUCTED ON SLOPES GREATER THAN 5 HORIZONTAL TO 1 <br /> (WITH A CATERPILLAR OF SIMILAR)PERPENDICULAR TO THE CONTOURS TO VERTICAL(5:1)SHALL BE KEYED INTO THE UNDISTURBED GROUND WITH <br /> 10. TREES NOT IDENTIFIED FOR REMOVAL SHALL BE PRESERVED OR PROTECTED IN 3. RETAIN THE DUFF LAYER,NATIVE TOPSOIL,AND NATURAL VEGETATION IN AN SCARIFY THE SOIL ENOUGH TO PROVIDE PLACES FOR THE SEED TO HORIZONTAL BENCHES OF SUFFICIENT WIDTH TO ALLOW FOR THE PROPER <br /> AN APPROVED MANOR PRIOR TO COMMENCEMENT OF GRADING OPERATIONS. UNDISTURBED STATE TO THE MAXIMUM EXTENT PRACTICAL. STICKIESTABLISH TO ALLOW GERMINATION.APPLY SEEDING WITHIN FIVE(5) OPERATION OF COMPACTION EQUIPMENT. <br /> DAYS AFTER FINISHED GRADING IS COMPLETE.EROSION CONTROL BLANKETS <br /> 11. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE ADEQUACY OF EROSION 4. INSPECT SEDIMENT CONTROL BMPS WEEKLY AT A MINIMUM,DAILY DURING A MAY BE USED WHERE SEEDING IS NOT FEASIBLE.COORDINATE WITH 9. IN THE EVENT THAT ANY UNFORESEEN CONDITIONS NOT COVERED BY THESE <br /> AND SEDIMENTATION CONTROL MEASURES THROUGHOUT THE COURSE OF STORM EVENT,AND AFTER ANY DISCHARGE FROM THE SITE(STORMWATER OR LANDSCAPE PLANS FOR ADDITIONAL INFORMATION. NOTES ARE ENCOUNTERED DURING GRADING OPERATIONS,KITTITAS COUNTY <br /> CONSTRUCTION.CONTRACTOR SHALL VERIFY ESC MEASURES ARE IN PLACE NON-STORMWATER).THE INSPECTION FREQUENCY MAY BE REDUCED TO ONCE PUBLIC WORKS SHALL BE IMMEDIATELY NOTIFIED IN ORDER TO PROVIDE <br /> PRIOR TO THE START OF CONSTRUCTION,AND SHALL REVIEW AND UPDATE A MONTH IF THE SITE IS STABILIZED AND INACTIVE. DEMOLITION NOTES GUIDANCE TO CONTRACTOR. <br /> THEM AS NECESSARY DURING THE COURSE OF THE PROJECT.EROSION AND <br /> SEDIMENTATION CONTROL MEASURES SHALL BE INSTALLED IN ACCORDANCE 5. CONTROL FUGITIVE DUST FROM CONSTRUCTION ACTIVITY IN ACCORDANCE 1. COORDINATE EXTENT OF DEMOLITION WITH PROPOSED IMPROVEMENTS. 10. SITE PREPARATION,GRADING,EXCAVATION AND FILL REQUIREMENTS BELOW <br /> WITH THESE PLANS AND MODIFIED AS NECESSARY TO ADDRESS THE WITH THE STATE AND/OR LOCAL AIR QUALITY CONTROL AUTHORITIES WITH CONTRACTOR SHALL REVIEW THE PROJECT LIMITS TO DETERMINE THE THE PROPOSED IMPROVEMENTS,EMBANKMENTS,AND UTILITY TRENCHING <br /> < NO TYPE OF DEMOLITION WASTE MATERIAL AND DEBRIS TO BE SHALL BE COMPLETED IN CONFORMANCE WITH WASHINGTON STATE <br /> CONSTRUCTION ACTIVITIES ON SITE. JURISDICTION OVER THE PROJECT AREA. DO NOT USE WATER WHEN IT MAY QUANTITY A <br /> DAMAGE ADJACENT CONSTRUCTION OR CREATE HAZARDOUS OR INCLUDED IN THEIR BID. THE CONTRACTOR IS RESPONSIBLE FOR REMOVING, DEPARTMENT OF TRANSPORTATION STANDARD SPECIFICATIONS AND THE <br /> m 12. PROJECTS THAT DISTURB ONE OR MORE ACRES OF LAND AND HAVE THE OBJECTIONABLE CONDITIONS,SUCH AS ICE,FLOODING,AND POLLUTION. AND RELOCATING IF NECESSARY,ANY ITEMS NOT OTHERWISE NOTED THAT GEOTECHNICAL ENGINEERING EVALUATION FOR THE SUBJECT SITE. <br /> P CONFLICT WITH THE CONSTRUCTION OF THE PROPOSED IMPROVEMENTS. THE <br /> POTENTIAL FOR RUNOFF DISCHARGE TO ANY SURFACE WATER BODY,SHALL <br /> FILE A NOTICE OF INTENT(NOI),WITH THE WASHINGTON STATE DEPARTMENT 6. STABILIZE EXPOSED UNWORKED SOILS(INCLUDING STOCKPILES),WHETHER AT CONTRACTOR SHALL NOTIFY KITTITAS COUNTY PUBLIC WORKS OF ANY 11. EXAMINE EXPOSED SUBGRADES AND BASE SURFACES FOR COMPLIANCE WITH <br /> OF ECOLOGY.CONTRACTOR SHALL PREPARE THE STORM WATER POLLUTION FINAL GRADE OR NOT,WITHIN 10 DAYS DURING THE REGIONAL DRY SEASON CONFLICTING ITEMS NOT SHOWN ON THE PLANS THAT MUST BE REMOVED OR REQUIREMENTS FOR DIMENSIONAL,GRADING,AND ELEVATION TOLERANCES. <br /> PREVENTION PLANS(SWPPP),AND COORDINATE WITH KITTITAS COUNTY PUBLIC (JULY 1 THROUGH SEPTEMBER 30)AND WITHIN 5 DAYS DURING THE REGIONAL RELOCATED. PREVENT SURFACE WATER AND GROUNDWATER FROM ENTERING <br /> WORKS THE TRANSFER OF RESPONSIBILITY STATED IN THE N01 TO THEIR NAME WET SEASON(OCTOBER 1 THROUGH JUNE 30).SOILS MUST BE STABILIZED AT EXCAVATIONS,FROM PONDING ON PREPARED SUBGRA DES AND BASE <br /> PRIOR TO START OF CONSTRUCTION. THE END OF A SHIFT BEFORE A HOLIDAY WEEKEND IF NEEDED BASED ON THE 2. MAINTAIN EXISTING UTILITIES INDICATED TO REMAIN IN SERVICE AND PROTECT SURFACES,AND FROM FLOODING PROJECT SITE AND SURROUNDING AREA. <br /> WEATHER FORECAST.THIS TIME LIMIT MAY ONLY BE ADJUSTED BY A LOCAL THEM AGAINST DAMAGE DURING DEMOLITION OPERATIONS. DO NOT PROTECT,DAMAGE B AND BASE SURFACES FROM SOFTENING,UNDERMINING, <br /> WASHOUT,DAMAGE B <br /> 13. THE CONTRACTOR SHALL BE RESPONSIBLE FOR ALL TRAFFIC CONTROL,IN JURISDICTION WITH A"QUALIFIED LOCAL PROGRAM,"IF IT CAN BE INTERRUPT EXISTING UTILITIES SERVING ADJACENT OCCUPIED OR OPERATING Y RAIN OR WATER ACCUMULATION,AND AGAINST <br /> ACCORDANCE WITH THE M.U.T.C.D.,CURRENT EDITION.AT LEAST 48 HOURS DEMONSTRATED THAT THE RECENT PRECIPITATION JUSTIFIES A DIFFERENT FACILITIES UNLESS AUTHORIZED IN WRITING BY OWNER AND AUTHORITIES FREEZING TEMPERATURES AND FROST. <br /> PRIOR TO DISRUPTION OF ANY TRAFFIC,TRAFFIC CONTROL PLANS SHALL BE STANDARD AND MEETS THE REQUIREMENTS SET FORTH IN THE CONSTRUCTION HAVING JURISDICTION. PROVIDE TEMPORARY SERVICES DURING J <br /> PREPARED AND SUBMITTED TO KITTITAS COUNTY PUBLIC WORKS FOR STORMWATER GENERAL PERMIT. INTERRUPTIONS TO EXISTING UTILITIES,AS ACCEPTABLE TO OWNER AND 12. SPOT ELEVATIONS ARE FOR FINISH GRADE UNLESS OTHERWISE NOTED. Q <br /> APPROVAL.NO WORK SHALL COMMENCE UNTIL AUTHORIZATION IS ISSUED AND AUTHORITIES HAVING JURISDICTION. <br /> ALL APPROVED TRAFFIC CONTROL IS IN PLACE. 7. COVER,CONTAIN AND PROTECT ALL CHEMICALS,LIQUID PRODUCTS, 13. UNLESS ELEVATIONS AND/OR CONTOURS ARE OTHERWISE SHOWN,NEW FINISH <br /> o PETROLEUM PRODUCT,AND NON-INERT WASTES PRESENT ON SITE FROM 3. COORDINATE DEMOLITION OPERATIONS AND ANY REQUIRED UTILITY GRADE SURFACES SHALL BE PLACED TO ALLOW FOR POSITIVE DRAINAGE TO <br /> 14. INFORMATION ON EXISTING CONDITIONS AND BOUNDARIES/RIGHT OF WAY VANDALISM,USE SECONDARY CONTAINMENT FOR ON-SITE FUELING TANKS. RELOCATIONS WITH KITTITAS COUNTY PUBLIC WORKS AND APPROPRIATE RUNOFF COLLECTION DEVICES OR FACILITIES. MAINTAIN POSITIVE DRAINAGE m <br /> SHOWN ON THESE PLANS WAS OBTAINED FROM A SURVEY NOT PERFORMED BY UTILITY PURVEYOR,INCLUDING REQUIREMENTS AND SCHEDULING. AWAY FROM STRUCTURES. IF FIELD GRADE ADJUSTMENTS ARE REQUIRED,THE <br /> CONTRACTOR SHALL NOTIFY KITTITAS COUNTY PUBLIC WORKS IMMEDIATELY. 000FFMAN ENGINEERS. THE CONTRACTOR SHALL FIELD VERIFY EXISTING 8. CONDUCT MAINTENANCE AND REPAIR OF HEAVY EQUIPMENT AND VEHICLES <br /> CONDITIONS AND REQUIRED ELEVATIONS AT THE SUBJECT SITE. VERIFY THE INVOLVING OIL CHANGES,HYDRAULIC SYSTEM REPAIRS,SOLVENT AND 4. COMPLY WITH KITTITAS COUNTY PUBLIC WORKS HAULING AND DISPOSAL <br /> LOCATION AND SIZE OF EXISTING UTILITIES BEFORE PROCEEDING WITH DE-GREASING OPERATIONS,FUEL TANK DRAIN DOWN AND REMOVAL,AND REGULATIONS. 0 <br /> o CONSTRUCTION ACTIVITIES,INCLUDING UNDERGROUND AND OVERHEAD OTHER ACTIVITIES THAT MAY RESULT IN DISCHARGE OR SPILLAGE OF <br /> UTILITIES,UTILITY STRUCTURES, AND UTILITY CROSSINGS. NOTIFY KITTITAS POLLUTANTS TO THE GROUND OR INTO STORMWATER RUNOFF USING SPILL 5. IF MATERIALS SUSPECTED OF CONTAINING HAZARDOUS MATERIALS ARE <br /> o COUNTY PUBLIC WORKS OF ANY DISCREPANCIES OR EXCEPTIONS PREVENTION MEASURES,SUCH AS DRIP PANS.CLEAN ALL CONTAMINATED ENCOUNTERED,DO NOT DISTURB;IMMEDIATELY NOTIFY KITTITAS COUNTY <br /> ENCOUNTERED PRIOR TO PROCEEDING. SURFACES IMMEDIATELY FOLLOWING ANY DISCHARGE OR SPILL INCIDENT.IF PUBLIC WORKS. N <br /> LID <br /> RAINING OVER EQUIPMENT OR VEHICLE,PERFORM EMERGENCY REPAIRS ON <br /> m 15. THE CONTRACTOR SHALL PERFORM ALL WORK NECESSARY TO COMPLETE THIS SITE USING TEMPORARY PLASTIC BENEATH THE VEHICLE. 6. REMOVE OBSTRUCTIONS,TREES,SHRUBS,GRASS,AND OTHER VEGETATION TO <br /> PROJECT IN ACCORDANCE WITH THE CONSTRUCTION DOCUMENTS,INCLUDING <br /> PERMIT INSTALLATION OF NEW CONSTRUCTION.REMOVAL OF TREES AND N <br /> SUCH INCIDENTALS AS MAY BE NECESSARY TO MEET THE REQUIREMENTS AND 9. CONDUCT APPLICATION OF AGRICULTURAL CHEMICALS,INCLUDING SHRUBS WITHIN AREA OF NEW CONSTRUCTION SHALL INCLUDE DIGGING OUT >_ <br /> STANDARDS OF THE AUTHORITIES HAVING JURISDICTION. FERTILIZERS AND PESTICIDES,IN SUCH A MANNER,AND AT APPLICATION STUMPS AND OBSTRUCTIONS AND GRUBBING ROOTS. REMOVAL OF TREES IN Q <br /> RATES,THAT INHIBITS THE LOSS OF CHEMICALS INTO STORMWATER RUNOFF AREAS ADJACENT TO TREES THAT ARE TO REMAIN AND BE PROTECTED SHALL <br /> FACILITIES.AMEND MANUFACTURER'S RECOMMENDED APPLICATION RATES INCLUDE TREE REMOVAL AND GRINDING OF STUMP TO 3"BELOW FINISHED <br /> i AND PROCEDURES TO MEET THIS REQUIREMENT,IF NECESSARY. GRADE. STUMP AND ROOT REMOVAL IS NOT ALLOWED IN THESE AREAS TO m <br /> PRESERVE HEALTH OF ADJACENT TREES. W <br /> L� <br /> 0 <br /> umMi 0 0 1 NAME OR INITIALS AND DATE GEOGRAPHIC INFORMATION <br /> w 221 N.WMII Street,SUAe 1. DESIGNED 4705o9,N _-- TA N E U M CREEK R M 5 <br /> o IF THIS BAR DOES NOT -C O F F M A N Spokane,WA 9 CHECKED <br /> 99201&1 CBM _ LONGITUDE 12D_47�L 0"W_ GENERAL NOTES <br /> ppok-, <br /> MEASURE 1"THEN ENGINEERS BRIDGE DESIGN <br /> ap DRAWING IS NOT PLOTTED www.coR an.com DRAWN KCM ___TN/SC/RG T-LBNZgQj/ 16E___ <br /> TO ORIGINAL SCALE. CBM _ DATE FEBRUARY 2026,___ SHEET 30 OF 45 <br /> CHECKED <br /> rl <br />