My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Resolution_Snoqualmie Pass Comprehensive Safety Action Plan
>
Meetings
>
2026
>
05. May
>
2026-05-05 10:00 AM - Commissioners' Agenda
>
Resolution_Snoqualmie Pass Comprehensive Safety Action Plan
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/30/2026 12:25:25 PM
Creation date
4/30/2026 12:15:26 PM
Metadata
Fields
Template:
Meeting
Date
5/5/2026
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Item
Request to Approve a Resolution to Adopt the Snoqualmie Pass Comprehensive Safety Action Plan
Order
8
Placement
Consent Agenda
Row ID
144005
Type
Resolution
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
366
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ė <br />Ē <br />Ęę <br />ĕ <br />ē <br />Ě <br />Ė <br />Ĕ <br />Ēđ <br />ĒĒ <br />Ēē <br />;°Áìá <br />> ¾ <br />D Ý <br />> ¾ <br />/ÝÎÈģ <br /> <br />- <br />Î <br />Ý <br />á <br /> <br />ģ <br /> <br />d <br />Ý <br />Á <br />z <br /> <br />ÁÁ <br />Î <br />ø <br />á <br />è <br />Î <br />È <br /> <br />d <br />Ý <br /> <br />² <br />Á <br />Z <br />d ÈÈÝģ <br /> <br />t <br /> <br />þ <br />9 <br />þ <br />ģ <br /> <br />> <br />È <br />^È <br />Î <br />ø <br />á <br />° <br />Î <br /> <br />ģ <br /> <br />> <br />È <br />-þ ¾Ý ¾ <br />K <br />Á <br />á <br />Î <br />È <br />ģ <br /> <br /> <br />Ý <br />Î Á ݾ <br />/ <br />È <br />È <br />á <br /> <br />Ý <br />ì <br /> <br />¾ <br />ģ <br /> <br /> <br />Ý <br />dݲÁ <br />Á <br />² <br />ì <br />Ç <br />ģ <br /> <br />> <br />Î <br />Î <br />Ú <br />' ÝDzá°ģ <br /> <br />W <br />Á <br />^² <br />Á <br />÷ <br /> <br />Ý <br />ģ <br /> <br />& <br />² <br />Ý <br />ģ <br /> <br />Z <br /> <br />'ÎÁÝ ¾ <br />^ <br />È <br />Î <br />Ü <br />ì Á Ç ²Ý Z Ç <br />Ú <br /> <br />Ý <br />è <br />ģ <br /> <br /> <br />Ý <br />- <br />þ <br />¾ <br /> <br />Ý <br /> <br />W Á Î ì á èÎ á á ^è è W Ý ¾d Ý Á <br />D ²Á Á ݾ <br />^ <br />ģ <br /> <br /> <br /> <br />È <br />È <br />þ <br />ģ <br /> <br /> <br />Ý <br /> <br /> <br />¾ <br />ģ <br /> <br />Z <br /> <br />;È <br /> <br /> <br />Á <br />Á <br />W <br />¾ <br />t þ <br />Ěđė <br />Ěđ <br />>ªÈ <br />dD <br />dì <br />^èìþģ Ý <br />ÎìÈèþģ>²È <br />Ę <br />ę <br />Ěđė <br />đ ġ Ġ D²Áá <br />Exit 52 EB Off Ramp <br />& SR 906 <br />SR 906 & Guye <br />Peak Lane <br />SR 906 <br />Exit 53 I-90 WB <br />Ramp & Yellowstone <br />Trail Road <br />SR 906 & <br />Tanner Way <br />Exit 54 EB Off Ramp <br />& Snoqualmie Drive <br />SR 906 & <br />Hyak Drive E <br />Exit 54 I-90 WB <br />Ramp & Lake <br />Mardee Road <br />SR 906 <br />SR 906 <br />Hyak Drive E <br />Lake Mardee Road <br />Volume & Speed Trends <br />In addition to reviewing collision data, <br />the project team analyzed traffic volume <br />and speed data to better understand <br />current roadway conditions and evaluate <br />how capacity constraints may affect <br />the performance and safety of the <br />transportation network in Snoqualmie <br />Pass. <br />Traffic volume and speed data were collected <br />at multiple locations throughout Snoqualmie <br />Pass to evaluate roadway and intersection <br />performance. Tube counters were installed at <br />midblock locations along SR 906, while turning <br />movement counts (TMCs) were collected at <br />key intersections. Data was collected in two <br />periods to capture seasonal travel patterns: <br />October 16th to 21st, 2024, and February 14th <br />to 17th, 2025 (Presidents’ Day weekend). The <br />October data provided a baseline for non-winter <br />conditions while the February data captured <br />winter conditions during expected peak winter <br />activity. Field observations were also made on <br />December 31st, 2024 and January 1st, 2025 to <br />review conditions during the busy winter holiday <br />season. Figure 19 shows the locations where <br />tube counters and TMC cameras were installed. <br />Figure 19. Count <br />Collection Locations <br />Source: Fehr & Peers, 2025. <br />34Kittitas County | Snoqualmie Pass Comprehensive Safety Plan
The URL can be used to link to this page
Your browser does not support the video tag.