Laserfiche WebLink
HCM 7th TWSC <br />3: I-90 WB Off Ramp/I-90 WB On Ramp & Yellowstone Trail Rd 06/09/2025 <br />PM Weekend Future - February 2045 3:33 pm 05/16/2025 Baseline Synchro 12 Report <br />Page 3 <br />Intersection <br />Int Delay, s/veh 7.3 <br />Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR <br />Lane Configurations <br />Traffic Vol, veh/h 300 20 0 0 15 5 85 5 5 0 0 0 <br />Future Vol, veh/h 300 20 0 0 15 5 85 5 5 0 0 0 <br />Conflicting Peds, #/hr 0 0 0 0 0 0 0 0 0 0 0 0 <br />Sign Control Free Free Free Free Free Free Stop Stop Stop Free Free Free <br />RT Channelized - - None - - None - - None - - None <br />Storage Length - - - - - - - - - - - - <br />Veh in Median Storage, # - 0 - - 0 - - 0 - - 0 - <br />Grade, %- 0 - - 0 - - 0 - - 0 - <br />Peak Hour Factor 83 83 83 75 75 75 75 75 75 88 88 88 <br />Heavy Vehicles, % 0 0 0 0 0 0 2 2 2 0 0 0 <br />Mvmt Flow 361 24 0 0 20 7 113 7 7 0 0 0 <br />Major/Minor Major1 Major2 Minor1 <br />Conflicting Flow All 27 0 - - - 0 767 774 24 <br /> Stage 1 - - - - - - 747 747 - <br /> Stage 2 - - - - - - 20 27 - <br />Critical Hdwy 4.1 - - - - - 6.42 6.52 6.22 <br />Critical Hdwy Stg 1 - - - - - - 5.42 5.52 - <br />Critical Hdwy Stg 2 - - - - - - 5.42 5.52 - <br />Follow-up Hdwy 2.2 - - - - - 3.518 4.018 3.318 <br />Pot Cap-1 Maneuver 1600 - 0 0 - - 370 330 1052 <br /> Stage 1 - - 0 0 - - 468 420 - <br /> Stage 2 - - 0 0 - - 1003 873 - <br />Platoon blocked, %-- - <br />Mov Cap-1 Maneuver 1600 - - - - - 286 0 1052 <br />Mov Cap-2 Maneuver - - - - - - 286 0 - <br /> Stage 1 - - - - - - 361 0 - <br /> Stage 2 - - - - - - 1003 0 - <br />Approach EB WB NB <br />HCM Control Delay, s/v 7.41 0 8.46 <br />HCM LOS A <br />Minor Lane/Major Mvmt NBLn1 EBL EBT WBT WBR <br />Capacity (veh/h)1052 1579 - - - <br />HCM Lane V/C Ratio 0.013 0.226 - - - <br />HCM Control Delay (s/veh) 8.5 7.9 0 - - <br />HCM Lane LOS A A A - - <br />HCM 95th %tile Q(veh) 0 0.9 - - -