My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Resolution_Snoqualmie Pass Comprehensive Safety Action Plan
>
Meetings
>
2026
>
05. May
>
2026-05-05 10:00 AM - Commissioners' Agenda
>
Resolution_Snoqualmie Pass Comprehensive Safety Action Plan
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/30/2026 12:25:25 PM
Creation date
4/30/2026 12:15:26 PM
Metadata
Fields
Template:
Meeting
Date
5/5/2026
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Item
Request to Approve a Resolution to Adopt the Snoqualmie Pass Comprehensive Safety Action Plan
Order
8
Placement
Consent Agenda
Row ID
144005
Type
Resolution
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
366
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
HCM 7th TWSC <br />1: SR 906 & I-90 EB Off Ramp 06/09/2025 <br />PM Weekend Future - February 2045 3:33 pm 05/16/2025 Baseline Synchro 12 Report <br />Page 1 <br />Intersection <br />Int Delay, s/veh 2.8 <br />Movement EBL EBR NBL NBT SBT SBR <br />Lane Configurations <br />Traffic Vol, veh/h 105 350 0 545 110 0 <br />Future Vol, veh/h 105 350 0 545 110 0 <br />Conflicting Peds, #/hr 25 25 33 0 0 25 <br />Sign Control Stop Stop Free Free Free Free <br />RT Channelized - Free - None - None <br />Storage Length 0 0 - - - - <br />Veh in Median Storage, # 0 - - 0 0 - <br />Grade, %0 - - 0 0 - <br />Peak Hour Factor 86 86 85 85 84 84 <br />Heavy Vehicles, % 0 0 1 1 5 5 <br />Mvmt Flow 122 407 0 641 131 0 <br />Major/Minor Minor2 Major1 Major2 <br />Conflicting Flow All 797 - - 0 - 0 <br /> Stage 1 131 - - - - - <br /> Stage 2 666 - - - - - <br />Critical Hdwy 6.4 - - - - - <br />Critical Hdwy Stg 1 5.4 - - - - - <br />Critical Hdwy Stg 2 5.4 - - - - - <br />Follow-up Hdwy 3.5 - - - - - <br />Pot Cap-1 Maneuver 358 0 0 - - 0 <br /> Stage 1 900 0 0 - - 0 <br /> Stage 2 514 0 0 - - 0 <br />Platoon blocked, %- - <br />Mov Cap-1 Maneuver 358 - - - - - <br />Mov Cap-2 Maneuver 358 - - - - - <br /> Stage 1 900 - - - - - <br /> Stage 2 514 - - - - - <br />Approach EB NB SB <br />HCM Control Delay, s/v20.15 0 0 <br />HCM LOS C <br />Minor Lane/Major Mvmt NBTEBLn1EBLn2 SBT <br />Capacity (veh/h)- 358 - - <br />HCM Lane V/C Ratio - 0.341 - - <br />HCM Control Delay (s/veh) - 20.2 0 - <br />HCM Lane LOS - C A - <br />HCM 95th %tile Q(veh) - 1.5 - -
The URL can be used to link to this page
Your browser does not support the video tag.