Laserfiche WebLink
HCM 7th TWSC <br />6: SR 906 & I-90 EB Off Ramp/I-90 EB On Ramp 01/31/2025 <br />PM Weekend Existing - October 2024 12:34 pm 11/12/2024 Baseline Synchro 12 Report <br />Page 6 <br />Intersection <br />Int Delay, s/veh 3 <br />Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR <br />Lane Configurations <br />Traffic Vol, veh/h 23 0 21 0 0 0 0 56 17 4 35 0 <br />Future Vol, veh/h 23 0 21 0 0 0 0 56 17 4 35 0 <br />Conflicting Peds, #/hr000000000000 <br />Sign Control Stop Stop Stop Free Free Free Free Free Free Free Free Free <br />RT Channelized - - None - - None - - None - - None <br />Storage Length ------------ <br />Veh in Median Storage, # - 0 - - 0 - - 0 - - 0 - <br />Grade, % - 0 - - 0 - - 0 - - 0 - <br />Peak Hour Factor 75 75 75 85 85 85 91 91 91 75 75 75 <br />Heavy Vehicles, % 000000333101010 <br />Mvmt Flow 31 0 28 0 0 0 0 62 19 5 47 0 <br />Major/Minor Minor2 Major1 Major2 <br />Conflicting Flow All 119 138 47 - 0 0 80 0 0 <br /> Stage 1 57 57 ------- <br /> Stage 2 62 80 ------- <br />Critical Hdwy 6.4 6.5 6.2 - - - 4.2 - - <br />Critical Hdwy Stg 15.45.5------- <br />Critical Hdwy Stg 25.45.5------- <br />Follow-up Hdwy 3.5 4 3.3 - - - 2.29 - - <br />Pot Cap-1 Maneuver 882 757 1028 0 - - 1468 - 0 <br /> Stage 1 970 851 -0 ----0 <br /> Stage 2 966 832 -0 ----0 <br />Platoon blocked, %- -- <br />Mov Cap-1 Maneuver 878 0 1028 - - - 1468 - - <br />Mov Cap-2 Maneuver 878 0 ------- <br /> Stage 1 970 0 ------- <br /> Stage 2 963 0 ------- <br />Approach EB NB SB <br />HCM Control Delay, s/v 9.07 0 0.77 <br />HCM LOS A <br />Minor Lane/Major Mvmt NBT NBREBLn1 SBL SBT <br />Capacity (veh/h)- - 944 185 - <br />HCM Lane V/C Ratio - - 0.062 0.004 - <br />HCM Control Delay (s/veh) - - 9.1 7.5 0 <br />HCM Lane LOS - - A A A <br />HCM 95th %tile Q(veh) - - 0.2 0 -