Laserfiche WebLink
HCM 7th TWSC <br />5: Hyak Dr E & SR 906 & Driveway 01/31/2025 <br />PM Weekend Existing - October 2024 12:34 pm 11/12/2024 Baseline Synchro 12 Report <br />Page 5 <br />Intersection <br />Int Delay, s/veh 5.5 <br />Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR <br />Lane Configurations <br />Traffic Vol, veh/h 12 9 14 2 15 34 11 23 3 10 23 21 <br />Future Vol, veh/h 12 9 14 2 15 34 11 23 3 10 23 21 <br />Conflicting Peds, #/hr000000000000 <br />Sign Control Free Free Free Free Free Free Stop Stop Stop Stop Stop Stop <br />RT Channelized - - None - - None - - None - - None <br />Storage Length ------------ <br />Veh in Median Storage, # - 0 - - 0 - - 0 - - 0 - <br />Grade, % - 0 - - 0 - - 0 - - 0 - <br />Peak Hour Factor 75 75 75 75 75 75 75 75 75 75 75 75 <br />Heavy Vehicles, % 666222000999 <br />Mvmt Flow 16 12 19 3 20 45 15 31 4 13 31 28 <br />Major/Minor Major1 Major2 Minor1 Minor2 <br />Conflicting Flow All 65 0 0 31 0 0 94 124 21 107 111 43 <br /> Stage 1 ------5353-4848- <br /> Stage 2 ------4171-5963- <br />Critical Hdwy 4.16 - - 4.12 - - 7.1 6.5 6.2 7.19 6.59 6.29 <br />Critical Hdwy Stg 1 ------6.15.5-6.195.59- <br />Critical Hdwy Stg 2 ------6.15.5-6.195.59- <br />Follow-up Hdwy 2.254 - - 2.218 - - 3.5 4 3.3 3.581 4.081 3.381 <br />Pot Cap-1 Maneuver 1512 - - 1582 - - 894 770 1062 855 767 1008 <br /> Stage 1 ------964854-948841- <br /> Stage 2 ------979840-935829- <br />Platoon blocked, %- -- - <br />Mov Cap-1 Maneuver 1512 - - 1582 - - 824 761 1062 808 757 1008 <br />Mov Cap-2 Maneuver ------824761-808757- <br /> Stage 1 ------954845-946840- <br /> Stage 2 ------916839-888820- <br />Approach EB WB NB SB <br />HCM Control Delay, s/v 2.54 0.29 9.79 9.5 <br />HCM LOS A A <br />Minor Lane/Major Mvmt NBLn1 EBL EBT EBR WBL WBT WBRSBLn1 <br />Capacity (veh/h)786 550 - - 62 - - 859 <br />HCM Lane V/C Ratio 0.044 0.011 - - 0.002 - - 0.068 <br />HCM Control Delay (s/veh) 9.8 7.4 0 - 7.3 0 - 9.5 <br />HCM Lane LOS A A A - A A - A <br />HCM 95th %tile Q(veh) 0.1 0 - - 0 - - 0.2