Laserfiche WebLink
HCM 7th TWSC <br />3: I-90 WB Off Ramp/I-90 WB On Ramp & Yellowstone Trail Rd 01/31/2025 <br />PM Weekend Existing - October 2024 12:34 pm 11/12/2024 Baseline Synchro 12 Report <br />Page 3 <br />Intersection <br />Int Delay, s/veh 6.5 <br />Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR <br />Lane Configurations <br />Traffic Vol, veh/h 30900847426000 <br />Future Vol, veh/h 30900847426000 <br />Conflicting Peds, #/hr000000000000 <br />Sign Control Free Free Free Free Free Free Stop Stop Stop Free Free Free <br />RT Channelized - - None - - None - - None - - None <br />Storage Length ------------ <br />Veh in Median Storage, # - 0 - - 0 - - 0 - - 0 - <br />Grade, % - 0 - - 0 - - 0 - - 0 - <br />Peak Hour Factor 75 75 75 75 75 75 98 98 98 83 83 83 <br />Heavy Vehicles, % 000000000000 <br />Mvmt Flow 4012001157626000 <br />Major/Minor Major1 Major2 Minor1 <br />Conflicting Flow All 16 0 - - - 0 103 108 12 <br /> Stage 1 ------9292- <br /> Stage 2 ------1116- <br />Critical Hdwy 4.1-----6.46.56.2 <br />Critical Hdwy Stg 1 ------5.45.5- <br />Critical Hdwy Stg 2 ------5.45.5- <br />Follow-up Hdwy 2.2-----3.543.3 <br />Pot Cap-1 Maneuver 1615 - 0 0 - - 900 786 1074 <br /> Stage 1 - - 0 0 - - 937 823 - <br /> Stage 2 - - 0 0 - - 1018 886 - <br />Platoon blocked, %-- - <br />Mov Cap-1 Maneuver 1615 -----87801074 <br />Mov Cap-2 Maneuver ------8780- <br /> Stage 1 ------9130- <br /> Stage 2 ------1018 0 - <br />Approach EB WB NB <br />HCM Control Delay, s/v 5.6 0 8.38 <br />HCM LOS A <br />Minor Lane/Major Mvmt NBLn1 EBL EBT WBT WBR <br />Capacity (veh/h)1074 1385 - - - <br />HCM Lane V/C Ratio 0.008 0.025 - - - <br />HCM Control Delay (s/veh) 8.4 7.3 0 - - <br />HCM Lane LOS A A A - - <br />HCM 95th %tile Q(veh) 0 0.1 - - -