Laserfiche WebLink
HCM 7th TWSC <br />1: SR 906 & I-90 EB Off Ramp 01/31/2025 <br />PM Weekday Future - October 2044 3:04 pm 01/08/2025 Baseline Synchro 12 Report <br />Page 1 <br />Intersection <br />Int Delay, s/veh 0.6 <br />Movement EBL EBR NBL NBT SBT SBR <br />Lane Configurations <br />Traffic Vol, veh/h 10 95 0 100 25 0 <br />Future Vol, veh/h 10 95 0 100 25 0 <br />Conflicting Peds, #/hr 0 0 0 0 0 0 <br />Sign Control Stop Stop Free Free Free Free <br />RT Channelized - Free - None - None <br />Storage Length 0 0 ---- <br />Veh in Median Storage, # 0 - - 0 0 - <br />Grade, % 0 - - 0 0 - <br />Peak Hour Factor 89 89 80 80 75 75 <br />Heavy Vehicles, % 21 21 6 6 0 0 <br />Mvmt Flow 11 107 0 125 33 0 <br />Major/Minor Minor2 Major1 Major2 <br />Conflicting Flow All 158 - - 0 - 0 <br /> Stage 1 33 ----- <br /> Stage 2 125 ----- <br />Critical Hdwy 6.61----- <br />Critical Hdwy Stg 15.61----- <br />Critical Hdwy Stg 25.61----- <br />Follow-up Hdwy 3.689----- <br />Pot Cap-1 Maneuver 790 0 0 - - 0 <br /> Stage 1 942 0 0 - - 0 <br /> Stage 2 856 0 0 - - 0 <br />Platoon blocked, % - - <br />Mov Cap-1 Maneuver 790 ----- <br />Mov Cap-2 Maneuver 790 ----- <br /> Stage 1 942 ----- <br /> Stage 2 856 ----- <br />Approach EB NB SB <br />HCM Control Delay, s/v 9.62 0 0 <br />HCM LOS A <br />Minor Lane/Major Mvmt NBTEBLn1EBLn2 SBT <br />Capacity (veh/h)- 790 - - <br />HCM Lane V/C Ratio - 0.014 - - <br />HCM Control Delay (s/veh) - 9.6 0 - <br />HCM Lane LOS - A A - <br />HCM 95th %tile Q(veh) - 0 - -