Laserfiche WebLink
BELSAAS & SMITH CONSTRUCTION <br />SHEET 2 of 2 C.O.P. #18 <br />CHANGE ORDER PROPOSAL BREAKDOWN SHEET <br />EQUIP SUB MATERIAL LABOR <br />COST COST COST COST <br />TOTALS FROM PREVIOUS PAGE 200.00$ 28,091.00$ 2,763.00$ 5,015.13$ <br />OVERHEAD 3%6.00$ 842.73$ 82.89$ 150.45$ <br />PROFIT 10%20.60$ 2,893.37$ 284.59$ 516.56$ <br />BONDING 1.5%3.40$ 477.41$ 46.96$ 85.23$ <br />SUB TOTAL 230.00$ 32,304.51$ 3,177.44$ 5,767.37$ <br />SUB TOTAL 230.00$ 32,304.51$ 3,177.44$ 5,767.37$ <br />LABOR 5,767.37$ <br />MATERIAL 3,177.44$ <br />EQUIPMENT 230.00$ <br />SUBCONTRACTORS 32,304.51$ <br />SUB TOTAL SUB TOTAL 41,479.32$ <br />PREVIOUS CO ALLOWANCE <br />GRAND TOTAL TOTAL 41,479.32$ <br />TIME EXTENTION REQUIRED: <br />NOTICE TO PROCEED REQUIRED BY: <br />WE RESERVE OUR RIGHTS UNDER THE CONTRACT TO ACCESS THIS CHANGE <br />CUMULATIVELY AS IT AFFECTS TIME AND AMOUNT. <br />4/21/26 <br />Reviewed <br />Docusign Envelope ID: C25FA4F8-E33D-86B7-827D-CBC596D54968