My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2026-04-27-minutes-public-works-study-session
>
Meetings
>
2026
>
05. May
>
2026-05-05 10:00 AM - Commissioners' Agenda
>
2026-04-27-minutes-public-works-study-session
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/30/2026 12:26:50 PM
Creation date
4/30/2026 12:15:15 PM
Metadata
Fields
Template:
Meeting
Date
5/5/2026
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Item
Approve Minutes
Order
1
Placement
Consent Agenda
Row ID
144005
Type
Minutes
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
383
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
906 <br />906 <br />90 <br />906 <br />150 ft <br />F <br />WSDOT <br />Parking Lot <br />0.6 mi to Tanner Way <br />O <br />ff-ramp <br />On-ramp <br />W <br />e <br />s <br />t <br />b <br />o <br />u <br />n <br />d <br />E <br />a <br />s <br />t <br />b <br />o <br />u <br />n <br />d <br />Exit 54 <br />0.2 m <br />i <br />0.2 mi <br />O <br />ff-r <br />a <br />m <br />p <br />O <br />n <br />- <br />r <br />a <br />m <br />p <br />La <br />k <br />e <br /> <br />M <br />ard <br />e <br />e <br /> <br />R <br />d <br />S R 90 6 SPUR <br />Kendall Peak <br />Lake Trailhead <br />H <br />y <br />a <br />k <br /> <br />D <br />r <br /> <br />E <br />Figure 32. Location F <br />Intersection Improvements <br />Sources: Fehr & Peers, 2025; Aerial <br />provided courtesy of Google Earth. <br />Near-term/Mid-term Project <br />Long-term Project <br />Landscape or <br />hardscape buffer <br />Intersection Improvement <br />Intersection of SR 906 & Hyak Drive E <br />Implement a dedicated left-turn lane on SR 906 EB toward the I-90 <br />EB and WB on-ramps to address congestion at peak times. <br />Install lighting to make the intersection more visible at night. For a <br />popular winter destination, ice on the roadway can limit stopping <br />sight distances and make approaching the intersection dangerous. <br />Lighting provides advanced warning of a congested area. <br />Reconfigure the roadway to reduce the intersection width and <br />decrease sign distance from the roadway. <br />Systematically apply multiple low-cost countermeasures at stop- <br />controlled intersections. Treatments include: <br /> Stop bars at existing stop sign locations <br /> Advanced warning signs, including “Stop Ahead” (W3- <br />1) and Cross Traffic Does Not Stop” signs (W4-4P) <br /> Oversized stop signs. <br />Construct a roundabout as a long-term solution to alleviate <br />confusion with the existing 2-way stop and provide a continuous <br />flow of traffic to reduce congestion. <br />Intersection Improvement <br />Intersection of I-90 EB <br />off-ramp & SR 906 <br />As a long-term solution, restrict <br />left-turn movements from the I-90 <br />off-ramp and require drivers to use the <br />roundabout crossing treatments. <br />Intersection Improvement <br />58Kittitas County | Snoqualmie Pass Comprehensive Safety Plan
The URL can be used to link to this page
Your browser does not support the video tag.