My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2026-04-27-minutes-public-works-study-session
>
Meetings
>
2026
>
05. May
>
2026-05-05 10:00 AM - Commissioners' Agenda
>
2026-04-27-minutes-public-works-study-session
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/30/2026 12:26:50 PM
Creation date
4/30/2026 12:15:15 PM
Metadata
Fields
Template:
Meeting
Date
5/5/2026
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Item
Approve Minutes
Order
1
Placement
Consent Agenda
Row ID
144005
Type
Minutes
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
383
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 2 of 2 <br />PUBLIC WORKS BOARD OF COUNTY COMMISSIONERS WORK SESSION STAFF REPORT <br />A professional services agreement was executed on September 13, 2024. Due to timing <br />and sequencing considerations, the full cultural resources scope was not included in the <br />original contract, and this scope was added through Contract Amendments 1 and 2. The <br />Flood Control Zone District has grant funding for the entire contracted amount of <br />$875,769.10. <br /> <br />DISCUSSION: <br />Additional funding is needed to complete the project scope due to design refinements <br />necessary to ensure the project meets habitat restoration and agricultural land use <br />objectives. At the 60 percent design stage, revisions are needed to address site hydrology <br />and optimize project performance. In addition, project coordination and wetland <br />delineation have required more effort than originally anticipated. <br /> <br />There may be cost savings in other elements of our grant agreement with the Recreation <br />and Conservation Office (RCO). If realized, those savings could be applied to the design <br />and permitting cost overruns. However, we will not know whether such cost savings are <br />available for several months. <br /> <br />Delaying design revisions would risk the project schedule and could affect our ability to <br />expend the $10,000,000 in Floodplains by Design implementation funding during the <br />grant period. <br /> <br />FISCAL IMPACTS: <br />If the additional funding need cannot be covered by cost savings within our RCO grant, <br />2026 Flood Control Zone District funding could be used to cover the additional cost. <br />There is sufficient fund balance available, but a budget amendment would be required if <br />those funds are needed. We recommend waiting until quarter 3 or 4 to pursue an <br />amendment, ensuring this step is taken only if necessary. <br />
The URL can be used to link to this page
Your browser does not support the video tag.