Laserfiche WebLink
HCM 7th TWSC <br />6: SR 906 & I-90 EB Off Ramp/I-90 EB On Ramp 06/09/2025 <br />PM Weekday Existing - February 2025 8:26 am 03/07/2025 Baseline Synchro 12 Report <br />Page 6 <br />Intersection <br />Int Delay, s/veh 2.4 <br />Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR <br />Lane Configurations <br />Traffic Vol, veh/h 14 1 73 0 0 0 0 145 41 1 29 0 <br />Future Vol, veh/h 14 1 73 0 0 0 0 145 41 1 29 0 <br />Conflicting Peds, #/hr 0 0 0 0 0 0 0 0 0 0 0 0 <br />Sign Control Stop Stop Stop Free Free Free Free Free Free Free Free Free <br />RT Channelized --None --None --None --None <br />Storage Length ------------ <br />Veh in Median Storage, #-0 --0 --0 --0 - <br />Grade, %-0 --0 --0 --0 - <br />Peak Hour Factor 88 88 88 86 86 86 75 75 75 88 88 88 <br />Heavy Vehicles, %1 1 1 0 0 0 4 4 4 3 3 3 <br />Mvmt Flow 16 1 83 0 0 0 0 193 55 1 33 0 <br />Major/Minor Minor2 Major1 Major2 <br />Conflicting Flow All 229 283 33 -0 0 248 0 0 <br /> Stage 1 35 35 ------- <br /> Stage 2 193 248 ------- <br />Critical Hdwy 6.41 6.51 6.21 ---4.13 -- <br />Critical Hdwy Stg 1 5.41 5.51 ------- <br />Critical Hdwy Stg 2 5.41 5.51 ------- <br />Follow-up Hdwy 3.509 4.009 3.309 ---2.227 -- <br />Pot Cap-1 Maneuver 762 627 1043 0 --1312 -0 <br /> Stage 1 990 868 -0 ----0 <br /> Stage 2 842 703 -0 ----0 <br />Platoon blocked, %--- <br />Mov Cap-1 Maneuver 761 0 1043 ---1312 -- <br />Mov Cap-2 Maneuver 761 0 ------- <br /> Stage 1 990 0 ------- <br /> Stage 2 841 0 ------- <br />Approach EB NB SB <br />HCM Control Delay, s/v 9.07 0 0.26 <br />HCM LOS A <br />Minor Lane/Major Mvmt NBT NBR EBLn1 SBL SBT <br />Capacity (veh/h)--985 60 - <br />HCM Lane V/C Ratio --0.102 0.001 - <br />HCM Control Delay (s/veh)--9.1 7.7 0 <br />HCM Lane LOS --A A A <br />HCM 95th %tile Q(veh)--0.3 0 -