My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2026-04-27-minutes-public-works-study-session
>
Meetings
>
2026
>
05. May
>
2026-05-05 10:00 AM - Commissioners' Agenda
>
2026-04-27-minutes-public-works-study-session
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/30/2026 12:26:50 PM
Creation date
4/30/2026 12:15:15 PM
Metadata
Fields
Template:
Meeting
Date
5/5/2026
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Item
Approve Minutes
Order
1
Placement
Consent Agenda
Row ID
144005
Type
Minutes
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
383
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
HCM 7th TWSC <br />5: Hyak Dr E & SR 906 & Driveway 06/09/2025 <br />PM Weekday Existing - February 2025 8:26 am 03/07/2025 Baseline Synchro 12 Report <br />Page 5 <br />Intersection <br />Int Delay, s/veh 7.6 <br />Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR <br />Lane Configurations <br />Traffic Vol, veh/h 35 1 38 0 9 48 50 101 2 13 58 33 <br />Future Vol, veh/h 35 1 38 0 9 48 50 101 2 13 58 33 <br />Conflicting Peds, #/hr 0 0 0 0 0 0 0 0 0 0 0 0 <br />Sign Control Free Free Free Free Free Free Stop Stop Stop Stop Stop Stop <br />RT Channelized --None --None --None --None <br />Storage Length ------------ <br />Veh in Median Storage, #-0 --0 --0 --0 - <br />Grade, %-0 --0 --0 --0 - <br />Peak Hour Factor 88 88 88 75 75 75 87 87 87 87 87 87 <br />Heavy Vehicles, %1 1 1 23 23 23 1 1 1 2 2 2 <br />Mvmt Flow 40 1 43 0 12 64 57 116 2 15 67 38 <br />Major/Minor Major1 Major2 Minor1 Minor2 <br />Conflicting Flow All 76 0 0 44 0 0 148 178 23 183 168 44 <br /> Stage 1 ------102 102 -44 44 - <br /> Stage 2 ------45 76 -139 124 - <br />Critical Hdwy 4.11 --4.33 --7.11 6.51 6.21 7.12 6.52 6.22 <br />Critical Hdwy Stg 1 ------6.11 5.51 -6.12 5.52 - <br />Critical Hdwy Stg 2 ------6.11 5.51 -6.12 5.52 - <br />Follow-up Hdwy 2.209 --2.407 --3.509 4.009 3.309 3.518 4.018 3.318 <br />Pot Cap-1 Maneuver 1529 --1439 --823 717 1057 778 725 1026 <br /> Stage 1 ------906 812 -970 858 - <br /> Stage 2 ------971 834 -864 793 - <br />Platoon blocked, %---- <br />Mov Cap-1 Maneuver 1529 --1439 --700 698 1057 633 706 1026 <br />Mov Cap-2 Maneuver ------700 698 -633 706 - <br /> Stage 1 ------882 791 -970 858 - <br /> Stage 2 ------863 834 -716 772 - <br />Approach EB WB NB SB <br />HCM Control Delay, s/v 3.51 0 11.16 10.21 <br />HCM LOS B B <br />Minor Lane/Major Mvmt NBLn1 EBL EBT EBR WBL WBT WBR SBLn1 <br />Capacity (veh/h)703 713 --1439 --796 <br />HCM Lane V/C Ratio 0.168 0.026 -----0.131 <br />HCM Control Delay (s/veh)11.2 7.4 0 -0 --10.2 <br />HCM Lane LOS B A A -A --B <br />HCM 95th %tile Q(veh)0.6 0.1 --0 --0.5
The URL can be used to link to this page
Your browser does not support the video tag.