My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R2023-050
>
Meetings
>
2023
>
04. April
>
2023-04-04 10:00 AM - Commissioners' Agenda
>
R2023-050
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/24/2026 11:01:52 AM
Creation date
4/24/2026 11:01:38 AM
Metadata
Fields
Template:
Meeting
Date
4/4/2023
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Fully Executed Version
Supplemental fields
Item
Request to Approve a Resolution Authorizing Lease Execution between Kittitas County and Pautzke Co. LLC
Order
7
Placement
Consent Agenda
Row ID
101486
Type
Resolution
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
28
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Elestrlcal: <br />a Wire all new offices with outlets and switch for light. <br />Demo and move wire for (new doorways and walls). <br />Retrofit all light fixtures on East side with LED ballast bypass tubes. <br />lnstalt new flat panel fixtures on West side of building in new office spaces. <br />a <br />a <br />PRICE: <br />Remodel of existing 8,388sf office facility to accornmodate new tenants. <br />Lump Sum Base Price , . $loz,ezg.oo Plus washlngton sbte sales Tax. <br />Work Not lncluded <br />o Building Permit fee's <br />o Fire sprinklers <br />o Fire separation areas due to increased occupancy <br />r Casework <br />o Demo/patch back required for added electricaUlow voltage within existing walls. <br />r Applianceinstallstion <br />. Exterlor utilities <br />o Cold weather protection and temporary heating <br />e Changes caused by local building officials or other government agencies. <br />o All work not specifically noted in this proposal. <br />o Work figured to be done during normal business hours. Overtime ls not currently figured into <br />this proposal. <br />. Weshington State Sales Tax <br />Alulrnrte One: Crrpet Tlle <br />. lnstallation of Phlladelphia Cornmercial Carbon Copy carpet tiles in lieu of Philadelphia <br />Commerclal Mcsh Weavc carpet tile. <br />Deduct from Bese Prlce . . ($8,476.m1 Plur Washirylon Stato Sales Tax. <br />Alt€rnrte Two: Electrlcsl By Owner <br />o Removal of electrical scope from proposal. <br />Deduct From Bsse Price . . ($57,889.001 Plus Washlnglon StINte Srlce Tax. <br />AltcrnetG Three: Falntlng <br />. Prep, prime and paint new and existing walls that have a new GWB flnish applied (West Side). <br />o Pr€p, prime and paint walls with new GWB finish. All existing walls to remain as is (East Side). <br />Deduct From Base Prlce . . ($10,520.001 Plus Washlngton Stste Ssles T.x. <br />Commercial Building Lease <br />Page24 of26 <br />3lPage
The URL can be used to link to this page
Your browser does not support the video tag.