Laserfiche WebLink
Framlnr: <br />r Furnish and install new 6" 20ga steel stud framing for new offices. New office room <br />numbers include rooms 103-107 and 115-116 (West), 108,117 and 118 (East). <br />Wosdl <br />r Furnish and install approx. loOlf of new !5"x?" S4S cherry base trim and door casing to <br />match existing as close as possible. <br />r Reinstall approx. 1,0O0lf of existing cherry base trim after new flooring has been installed. <br />Thermrl: <br />r Furnish and install approx. 25fi)sf of new R-11 blanket insulation overtop of act ceiling tiles. <br />o Furnish and install approL 1,950sf of 5.5" Rockwool Type lnsulation at 6" steel stud cavities. <br />Doon ond Hardwrre: <br />r Furnish and install eight (8) 3070 commercial grade hollow metal doors and frames. <br />Hardwere to include lockset, hinges, and24"x6O" glass relight. <br />r Furnish and install one (1) thr rated 3070 commercial grade hollow metal door, frame, and <br />hardware. Hardware to include grade one closure, lockset, and hinges. <br />r Furnish and lnstall three (3) pre-hung 3070 Maple door and frames. Door leaf to include <br />frosted full door glass relight kit to match existing. <br />Flnlehes <br />Furnish, install, tape, end texture with a light orange peel texture 5/8" GwB at new <br />partltion wall locations in both the east 3nd west sldes of the buildlng. <br />Tape and texture approx. 639sf of existing pre-hung 5/8" GWB in the west side of the <br />building. <br />Furnish and install approx. 2,500sf of new 2'x4' ACI grid. Existing tile are figured to be <br />reused where possible. <br />Prep, prime and paint new and existing walls that have a new gwb finish applied. (West <br />Side) <br />Prep, prime and paint new and existing walls excluding rooms 112, 113, 119, 120, 103, 101, <br />l0() and 102 (East) <br />Refinish existing cherry base board as needed. Appror l,0fi)lf of baseboard refinishing has <br />been included. <br />Furnish and install Philedelphia Gommercial Mesh Weave carpet tile in all areas except <br />109,114 tl'7-tl;g (West) and l:OL,tlz and 113 (East). <br />Furnish and install Tarkett 4" Rubber base in new western carpeted areas. <br />Mcchanicrl: <br />o Demo existing duct work as needed. <br />e Furnlsh and install supply and return duct work to new offices. <br />o lnstall new supply and retum grilles within new office spaces. <br />e Relocate existing thermostats as needed. <br />r Complete system start up and check for proper system operation. <br />2lPage <br />Commercial Building Lease <br />Page23 of26 <br />a <br />a <br />a <br />a <br />a <br />a <br />a <br />a