Laserfiche WebLink
|rr <br />4. Public Benefit: <br />Please describe the public benefit derived from project completion. <br />l. <br />The clearwells are integral to the water treatment process for the water system. They provide <br />both standby storage and contact time for disinfection. Without functional cleanruells ihe <br />drinking water would be non-potable for public use. <br />The existing cleanruells are leaking and have significant concrete failures that could lead to <br />failure of the structures. E <br />Define the total number of proJect partners demonstrating project support. <br />Although the City is the sole partner in the project, the City of Ronald is a recipient of the <br />treated water from Roslyn and is in support of completing the project to provide continued <br />water services. <br />6. Explain how construction ready this infrastructure projcct is relrtlve to design completeness and the permitting <br />proce$s. <br />The City has completed several evaluations of the clearwells to define the necessary scope <br />of work for design engineering. The request includes funding for design and any permitting <br />required. <br />7. lndicate the Estimeted Number of Short Term and/or Permanenl Jobs Created/Retained by the Project. <br />The project will add short term jobs during construction. The project will ensure the City <br />Public Works dept retains jobs related to the operations and maintenance of the water utility. <br />NOTE: Supplemental materials, including transmittal letter, are limited to a maximum of twenty (20) pages <br />single sided or ten (10) pages doubled sided including all graphics. Submittals shall be l2-point font. COG <br />reseryes the right to decline review ofsubmittals that exceed the stipulated length or fall to provide suflicient <br />font size. <br />Submit the original application to: <br />Kittitas County Department of Public Works <br />411 N. Ruby, Suite #1 <br />Ellensburg, WA 98926 <br />And to: <br />4 <br />candie.leader@co.kittitas.wa.us