My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Change Order 6 Fully Executed
>
Meetings
>
2026
>
03. March
>
2026-03-17 10:00 AM - Commissioners' Agenda
>
Change Order 6 Fully Executed
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/3/2026 12:19:15 PM
Creation date
4/3/2026 12:19:02 PM
Metadata
Fields
Template:
Meeting
Date
3/17/2026
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Fully Executed Version
Supplemental fields
Item
Request to Approve Chair Signature on Change Order No. 6 for the Rodeo Arena Seating Project
Order
11
Placement
Consent Agenda
Row ID
142644
Type
Agreement
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
q .ffi <br />Str- i LAi."l{.-"e <br />ti t_: t\l ti I r{t-il 1I.Jt-l <br />Daily Report of Force Account lVorked <br />lontrac't Number Date <br />3/4/2026 <br />Item Number <br />Ittem <br />Name <br />RFP 05 - l4tater Revisions pq Citt Comments <br />Contrac'tor Tier Subcontractor <br />C as c ade Cenl r sl C onstracti on Sellund Inc. <br />Descrlptlon of Work Performed <br />Extend 8" Ductile Iron Water (150 LD to the connection, 2,5tt Copper Semice (120 Ln' Oedit to HDPE <br />Time Worked Record <br />Hours Worl(ed <br />O.T. Rate AmountOccupation of Workers or Equipment Size Req,o.T.Reg, RateWorkera and/or Equipment <br />Working <br />Labor <br />$3,078.3030,0 $102.611Foreman <br />20.0 $100.07 82,001.402Operator (23 8 Excavator) <br />82,001.4020.0 $100.073Operal or ( I 3 I Excaval o0 <br />$100.07 81,200.8412,04Operator (Loader) <br />15.0 $100.07 $1,501.05AOperator (Mini Exc) <br />$2,001.4020.0 $100.076Operolor (Skid Steer) <br />$94.82 8189.647Operalor (Roller)2.0 <br />30.0 $66.07 $1,982.108Pipe Lqter <br />81,982. l030.0 866.07oPipe Layer (Topman) <br />862.45 $1,249.0020.010General Laborcr <br />$0.0011 <br />Labor Subtotal $17,187.23 <br />l5%o Markup $2,578.08 <br />$19,765.31Labor Total <br />Equipment <br />20.0 $137.12 $2,742.40't2 238 Excavator <br />$124.46 $2,489.2020.013138 Excmtalor <br />12.0 $84.33 $1,011.9614Loader <br />15.0 $56.10 $841.5015Mini Excavalor <br />880.18 $1,603.6020.016Skid Steer <br />2.0 $25.32 850.64't7 Rollzr <br />30.0 $43.80 $1,314.0018Hckup <br />40.0 $47.22 $1,888.8019I-Ton <br />Equipment Subtotal $t r,942.10 <br />$I,791.3215% Markup <br />Equipment Total $13,733.42 <br />Materlals <br />164.25 LF 846.62 $7,657.34208" DI PiPE <br />$1,490.22IEA$16s.5821FieM Lok Gaskets <br />LF $34.25 $4,452.502.5" Copper Pipe 13022 <br />I LS 8500.00 8500.0023Copper Fittings for Connections <br />-$1,756.39-1 LS $1,756.3924HDPE vs Copper Credit <br />LF $0.28 $41.3325Tracer Mre 150 <br />270 LF $0.03 $9.1726Scare Tape <br />$1,500.003,000 SF 80.s027Sod <br />20 TN 518.M $360.0028Crushed Rock <br />TN 82s.00 M,375.00Pipe Beddine (Pea GraveD 17529 <br />Materials Subtotal $18,629.16 <br />15% Markup $2,794.37 <br />Matefials Total $21,423.54 <br />Total $54,922.27 <br />By By <br />I
The URL can be used to link to this page
Your browser does not support the video tag.