Laserfiche WebLink
c0ltsTRutTlsilcCASCADE <br />CEI{TRIL PROPOSAL <br />F.O. Box ll9 <br />Wenatchee, WA, 98807{l{9 <br />Phon! !09€82.7119 <br />Fex !09{624t80 <br />To: <br />Kittltas County Comissioners <br />205 West Sth Ave, Suite 108 <br />Ellensburg, WA 98926 <br />MAKE CHECKS PAYABLE TO: <br />CascadG Ccntral Comtruction, LLC <br />P.O Box l{9 <br />Wcnatchcc, WA 98807{1119 <br />THANK YOU rcR YOUR SUS,,VESS' <br />PROJECT: Ellenrburg Rodco Arcna lmprovcmcntt <br />@P#21, <br />DATE: tilarch t,2028 <br />TITLE: Ncw PoG for Wfi. ll,hin Rcv.2 <br />DEI.OEgCiIPflON OI,AMTIW uoltl UNlt PruCI atoljl{t <br />3t5t20',6 Subcorlractol C6t <br />Civil Subcontractor - Se6 attached back-up 1 LS $54,922.77 $54,522,27 <br />Concrete Suboontractor - see attached baok-up 1 LS $2,123.t3 $2,123.7n <br />$0.00 <br />o% Marl(-utr 3.422.76 <br />Suboontractor - Sub Total 60 d68 78 <br />3t5t202f Cascad. C.naal Consltuction Cost <br />Supevlsion B HR $128.18 $1,025.44 <br />General Conditions 0 WD $925.00 $0.00 <br />Projsot Management & Coordinatlon I HR $101.54 $1,292.3? <br />Projsct Engine3r 4 HR $110.25 $465.00 <br />Laborer 0 HR $69.08 $0.00 <br />Carponter 0 HR $1 19.00 $0.00 <br />15% Mark-ur 417.41 <br />GeneEl Contractor - Sub Total 3.200.'t7s 63.668.93 <br />s604.85 <br />$89't.37 <br />Schcdulc lmpact: <br />TOTAL 3 65.165.15