My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2026-0206 Cle Elum Transfer Station Project Manual
>
Meetings
>
2026
>
04. April
>
2026-04-07 10:00 AM - Commissioners' Agenda
>
2026-0206 Cle Elum Transfer Station Project Manual
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/2/2026 12:38:37 PM
Creation date
4/2/2026 12:23:36 PM
Metadata
Fields
Template:
Meeting
Date
4/7/2026
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Item
Request to Approve an Agreement for Services with Gibson and Son for the New Entrance and Tank Replacement at the Cle Elum Transfer Station
Order
4
Placement
Consent Agenda
Row ID
143218
Type
Agreement
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
365
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
KITTITAS COUNTY SOLID WASTE ON-CALL <br />CLE ELUM TRANSFER STATION FRONT ENTRANCE DESIGN <br />PROJECT MEETINGS PW\JA\KITTCO02\ENTRANCE <br />01 31 19 - 2 JUNE 2023 <br />©COPYRIGHT 2023 JACOBS <br />1.03 PROGRESS MEETINGS <br />A. Contractor will schedule regular progress meetings at Site, conducted weekly <br />to review the Work progress, Progress Schedule, Schedule of Submittals, <br />Application for Payment, contract modifications, and other matters needing <br />discussion and resolution. <br />B. Attendees will include: <br />1. Owner’s representative. <br />2. Contractor, Subcontractors, and Suppliers, as appropriate. <br />3. Engineer’s representative may request to attend. <br />4. Others as appropriate. <br />1.04 QUALITY CONTROL MEETINGS <br />A. Scheduled by Contractor on regular basis and as necessary to review test and <br />inspection reports, and other matters relating to quality control of the Work <br />and work of other Contractors. <br />B. Attendees will include: <br />1. Contractor. <br />2. Contractor’s designated quality control representative. <br />3. Subcontractors and Suppliers, as necessary. <br />4. Engineer’s representatives may be requested or may request to join. <br />1.05 PREINSTALLATION MEETINGS <br />A. When required in individual Specification sections, convene at Site prior to <br />commencing the Work of that section. <br />B. Require attendance of entities directly affecting, or affected by, the Work of <br />that section. <br />C. Notify Engineer 5 days in advance of meeting date. <br />D. Provide suggested agenda to Engineer to include reviewing conditions of <br />installation, preparation and installation or application procedures, and <br />coordination with related Work and work of others. <br />1.06 OTHER MEETINGS <br />A. In accordance with Contract Documents and as may be required by Owner <br />and Engineer.
The URL can be used to link to this page
Your browser does not support the video tag.