My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2026-0206 Cle Elum Transfer Station Project Manual
>
Meetings
>
2026
>
04. April
>
2026-04-07 10:00 AM - Commissioners' Agenda
>
2026-0206 Cle Elum Transfer Station Project Manual
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/2/2026 12:38:37 PM
Creation date
4/2/2026 12:23:36 PM
Metadata
Fields
Template:
Meeting
Date
4/7/2026
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Item
Request to Approve an Agreement for Services with Gibson and Son for the New Entrance and Tank Replacement at the Cle Elum Transfer Station
Order
4
Placement
Consent Agenda
Row ID
143218
Type
Agreement
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
365
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
KITTITAS COUNTY SOLID WASTE ON-CALL <br />CLE ELUM TRANSFER STATION TANK REPLACEMENT <br /> SEPTEMBER 2025 Temporary Erosion and Sediment Control <br /> 015713 - 5 <br /> <br />9. Wherever runoff will flow around end of barrier or over the top, provide temporary splash <br />pad or other outlet protection; at such outlets in the run of the barrier, make barrier not <br />more than 12 inches (300 mm) high with post spacing not more than 4 feet (1220 mm). <br />C. Temporary Seeding: <br />1. When hydraulic seeder is used, seedbed preparation is not required. <br />2. When surface soil has been sealed by rainfall or consists of smooth undisturbed cut <br />slopes, and conventional or manual seeding is to be used, prepare seedbed by scarifying <br />sufficiently to allow seed to lodge and germinate. <br />3. If temporary mulching was used on planting area but not removed, apply nitrogen fertilizer <br />at 1 pound per 1000 sq ft (0.5 kg per 100 sq m). <br />4. On soils of very low fertility, apply 10-10-10 fertilizer at rate of 12 to 16 pounds per 1000 <br />sq ft (6 to 8 kg per 100 sq m). <br />5. Incorporate fertilizer into soil before seeding. <br />6. Apply seed uniformly; if using drill or cultipacker seeders place seed 1/2 to 1 inch (12 to 25 <br />mm) deep. <br />7. Irrigate as required to thoroughly wet soil to depth that will ensure germination, without <br />causing runoff or erosion. <br />8. Repeat irrigation as required until grass is established. <br />3.05 MAINTENANCE <br />A. Inspect preventive measures weekly, within 24 hours after the end of any storm that produces <br />0.5 inches (13 mm) or more rainfall at the project site, and daily during prolonged rainfall. <br />B. Repair deficiencies immediately. <br />C. Silt Fences: <br />1. Promptly replace fabric that deteriorates unless need for fence has passed. <br />2. Remove silt deposits that exceed one-third of the height of the fence. <br />3. Repair fences that are undercut by runoff or otherwise damaged, whether by runoff or <br />other causes. <br />D. Clean out temporary sediment control structures weekly and relocate soil on site. <br />E. Place sediment in appropriate locations on site; do not remove from site. <br />3.06 CLEAN UP <br />A. Remove temporary measures after permanent measures have been installed, unless permitted <br />to remain by Engineer. <br />B. Clean out temporary sediment control structures that are to remain as permanent measures. <br />C. Where removal of temporary measures would leave exposed soil, shape surface to an <br />acceptable grade and finish to match adjacent ground surfaces. <br />END OF SECTION
The URL can be used to link to this page
Your browser does not support the video tag.