My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2026-0206 Cle Elum Transfer Station Project Manual
>
Meetings
>
2026
>
04. April
>
2026-04-07 10:00 AM - Commissioners' Agenda
>
2026-0206 Cle Elum Transfer Station Project Manual
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/2/2026 12:38:37 PM
Creation date
4/2/2026 12:23:36 PM
Metadata
Fields
Template:
Meeting
Date
4/7/2026
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Item
Request to Approve an Agreement for Services with Gibson and Son for the New Entrance and Tank Replacement at the Cle Elum Transfer Station
Order
4
Placement
Consent Agenda
Row ID
143218
Type
Agreement
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
365
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
KITTITAS COUNTY SOLID WASTE ON-CALL <br />CLE ELUM TRANSFER STATION FRONT ENTRANCE DESIGN AND TANK REPLACEMENT <br />SEPTEMBER 2025 Quality Requirements <br /> <br /> 014000 - 3 <br />SECTION 014000 <br />QUALITY REQUIREMENTS <br />PART 1 GENERAL <br />1.01 SECTION INCLUDES <br />A. Submittals. <br />B. Quality assurance. <br />C. References and standards. <br />D. Testing and inspection agencies and services. <br />E. Control of installation. <br />F. Mock-ups. <br />G. Tolerances. <br />H. Manufacturers' field services. <br />I. Defect Assessment. <br />1.02 RELATED REQUIREMENTS <br />A. Section 014216 - Definitions. <br />1.03 SUBMITTALS <br />A. See Section 013000 - Administrative Requirements, for submittal procedures. <br />B. Test Reports: After each test/inspection, promptly submit two copies of report to Engineer and <br />to Contractor. <br />1. Test report submittals are for Engineer's knowledge as contract administrator for the <br />limited purpose of assessing compliance with information given and the design concept <br />expressed in the Contract Documents, or for Owner's information. <br />C. Certificates: When specified in individual specification sections, submit certification by the <br />manufacturer and Contractor or installation/application subcontractor to Engineer, in quantities <br />specified for Product Data. <br />1. Indicate material or product complies with or exceeds specified requirements. Submit <br />supporting reference data, affidavits, and certifications as appropriate. <br />D. Manufacturer's Instructions: When specified in individual specification sections, submit printed <br />instructions for delivery, storage, assembly, installation, start -up, adjusting, and finishing, for the <br />Owner's information. Indicate special procedures, perimeter conditions requiring special <br />attention, and special environmental criteria required for application or installation. <br />1.04 QUALITY ASSURANCE <br />A. Quality-Control Personnel Qualifications. Engage a person with requisite training and <br />experience to implement and manage quality assurance (QA) and quality control (QC) for the <br />project. <br />1.05 REFERENCES AND STANDARDS <br />A. For products and workmanship specified by reference to a document or documents not <br />included in the Project Manual, also referred to as reference standards, comply with <br />requirements of the standard, except when more rigid requirements are specified or are <br />required by applicable codes. <br />B. Comply with reference standard of date of issue current on date of Contract Documents, except <br />where a specific date is established by applicable code. <br />C. Obtain copies of standards where required by product specification sections. <br />D. Maintain copy at project site during submittals, planning, and progress of the specific work, until <br />Substantial Completion.
The URL can be used to link to this page
Your browser does not support the video tag.