Laserfiche WebLink
KITTITAS COUNTY SOLID WASTE ON-CALL <br />CLE ELUM TRANSFER STATION FRONT ENTRANCE DESIGN AND TANK REPLACEMENT <br />SEPTEMBER 2025 Construction Progress Schedule <br /> <br /> 013216 - 1 <br />SECTION 013216 <br />CONSTRUCTION PROGRESS SCHEDULE <br />PART 1 GENERAL <br />1.01 SECTION INCLUDES <br />A. Preliminary schedule. <br />B. Construction progress schedule, bar chart type. <br />1.02 SUBMITTALS <br />A. Within 15 days after date established in Notice to Proceed, submit preliminary schedule. <br />B. Submit updated schedule each month with request for payment. <br />PART 2 PRODUCTS - NOT USED <br />PART 3 EXECUTION <br />3.01 PRELIMINARY SCHEDULE <br />A. Prepare preliminary schedule in the form of a horizontal bar chart. <br />3.02 CONTENT <br />A. Show complete sequence of construction by activity, with dates for beginning and completion of <br />each element of construction. <br />B. Identify each item by specification section number. <br />C. Show accumulated percentage of completion of each item, and total percentage of Work <br />completed, as of the first day of each month. <br />D. Provide legend for symbols and abbreviations used. <br />3.03 BAR CHARTS <br />A. Include a separate bar for each major portion of Work or operation. <br />B. Identify the first work day of each week. <br />END OF SECTION