My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2026-0206 Cle Elum Transfer Station Project Manual
>
Meetings
>
2026
>
04. April
>
2026-04-07 10:00 AM - Commissioners' Agenda
>
2026-0206 Cle Elum Transfer Station Project Manual
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/2/2026 12:38:37 PM
Creation date
4/2/2026 12:23:36 PM
Metadata
Fields
Template:
Meeting
Date
4/7/2026
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Item
Request to Approve an Agreement for Services with Gibson and Son for the New Entrance and Tank Replacement at the Cle Elum Transfer Station
Order
4
Placement
Consent Agenda
Row ID
143218
Type
Agreement
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
365
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
KITTITAS COUNTY SOLID WASTE ON-CALL <br />CLE ELUM TRANSFER STATION FRONT ENTRANCE DESIGN AND TANK REPLACEMENT <br />SEPTEMBER 2025 Administrative Requirements <br /> <br /> 013000 - 5 <br />11. Inspection and acceptance of equipment put into service during construction period. <br />3.03 PROGRESS MEETINGS <br />A. Schedule and administer meetings throughout progress of the work at maximum weekly <br />intervals. <br />B. Attendance Required: <br />1. Contractor. <br />2. Owner. <br />3. Engineer. <br />C. Agenda: <br />1. Review minutes of previous meetings. <br />2. Review of work progress. <br />3. Field observations, problems, and decisions. <br />4. Identification of problems that impede, or will impede, planned progress. <br />5. Review of submittals schedule and status of submittals. <br />6. Maintenance of progress schedule. <br />7. Corrective measures to regain projected schedules. <br />8. Planned progress during succeeding work period. <br />9. Maintenance of quality and work standards. <br />10. Effect of proposed changes on progress schedule and coordination. <br />11. Other business relating to work. <br />3.04 CONSTRUCTION PROGRESS SCHEDULE <br />A. Within 15 days after date established in Notice to Proceed, submit preliminary schedule. <br />B. If preliminary schedule requires revision after review, submit revised schedule within 10 days. <br />C. Within 20 days after review of preliminary schedule, submit draft of proposed complete <br />schedule for review. <br />D. Within 10 days after joint review, submit complete schedule. <br />E. Submit updated schedule with each Application for Payment. <br />3.05 REQUESTS FOR INTERPRETATION (RFI) <br />A. Preparation: Prepare an RFI immediately upon discovery of a need for interpretation of <br />Contract Documents. Failure to submit a RFI in a timely manner is not a legitimate cause for <br />claiming additional costs or delays in execution of the work. <br />1. Prepare a separate RFI for each specific item. <br />B. Content: Include identifiers necessary for tracking the status of each RFI, and information <br />necessary to provide an actionable response. <br />1. Owner's, Engineer's, and Contractor's names. <br />2. Discrete and consecutive RFI number, and descriptive subject/title. <br />3. Issue date, and requested reply date. <br />4. Reference to particular Contract Document(s) requiring additional <br />information/interpretation. Identify pertinent drawing and detail number and/or <br />specification section number, title, and paragraph(s). <br />5. Annotations: Field dimensions and/or description of conditions which have engendered <br />the request. <br />6. Contractor's suggested resolution: A written and/or a graphic solution, to scale, is <br />required in cases where clarification of coordination issues is involved, for example; <br />routing, clearances, and/or specific locations of work shown diagrammatically in Contract <br />Documents. If applicable, state the likely impact of the suggested resolution on Contract <br />Time or the Contract Sum. <br />C. Attachments: Include sketches, coordination drawings, descriptions, photos, submittals, and <br />other information necessary to substantiate the reason for the request.
The URL can be used to link to this page
Your browser does not support the video tag.