My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2026-0206 Cle Elum Transfer Station Project Manual
>
Meetings
>
2026
>
04. April
>
2026-04-07 10:00 AM - Commissioners' Agenda
>
2026-0206 Cle Elum Transfer Station Project Manual
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/2/2026 12:38:37 PM
Creation date
4/2/2026 12:23:36 PM
Metadata
Fields
Template:
Meeting
Date
4/7/2026
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Item
Request to Approve an Agreement for Services with Gibson and Son for the New Entrance and Tank Replacement at the Cle Elum Transfer Station
Order
4
Placement
Consent Agenda
Row ID
143218
Type
Agreement
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
365
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
KITTITAS COUNTY SOLID WASTE ON-CALL <br />CLE ELUM TRANSFER STATION FRONT ENTRANCE DESIGN AND TANK REPLACEMENT <br />SEPTEMBER 2025 Administrative Requirements <br /> <br /> 013000 - 5 <br />SECTION 013000 <br />ADMINISTRATIVE REQUIREMENTS <br />PART 1 GENERAL <br />1.01 SECTION INCLUDES <br />A. General administrative requirements. <br />B. Preconstruction meeting. <br />C. Site mobilization meeting. <br />D. Progress meetings. <br />E. Construction progress schedule. <br />F. Number of copies of submittals. <br />G. Requests for Interpretation (RFI) procedures. <br />H. Submittal procedures. <br />1.02 GENERAL ADMINISTRATIVE REQUIREMENTS <br />A. Comply with requirements of Section 017000 - Execution and Closeout Requirements for <br />coordination of execution of administrative tasks with timing of construction activities. <br />PART 2 PRODUCTS - NOT USED <br />PART 3 EXECUTION <br />3.01 PRECONSTRUCTION MEETING <br />A. Engineer will schedule a meeting at project site after Notice of Award. <br />B. Attendance Required: <br />1. Owner. <br />2. Engineer. <br />3. Contractor. <br />C. Agenda: <br />1. Execution of Owner-Contractor Agreement. <br />2. Submission of executed bonds and insurance certificates. <br />3. Distribution of Contract Documents. <br />4. Submission of list of subcontractors, list of products, schedule of values, and progress <br />schedule. <br />5. Procedures and processing of field decisions, submittals, substitutions, applications for <br />payments, proposal request, Change Orders, and Contract closeout procedures. <br />6. Scheduling. <br />D. Record minutes and distribute copies within two days after meeting to participants, with copies <br />to Engineer, Owner, participants, and those affected by decisions made. <br />3.02 SITE MOBILIZATION MEETING (COMBINED WITH PRECONSTRUCTION MEETING) <br />A. Agenda: <br />1. Use of premises by Owner and Contractor. <br />2. Owner's requirements. <br />3. Construction facilities and controls provided by Owner. <br />4. Temporary utilities provided by Owner. <br />5. Survey and building layout. <br />6. Security and housekeeping procedures. <br />7. Schedules. <br />8. Application for payment procedures. <br />9. Procedures for testing. <br />10. Procedures for maintaining record documents.
The URL can be used to link to this page
Your browser does not support the video tag.