DOT Form 224-713 <br />Revised 12/2020 <br />Page 2 <br />ensure that stormwater will not flow onto the existing state highway pavement after the access connection paving <br />is completed. <br />5.Paved Access Connection <br />The Access Connection shall be constructed with the following materials, listed from top lift to bottom lift. The <br />thicknesses shown are minimum requirements, as additional material may be necessary to properly construct <br />the access connection. <br /> See Exhibit “ “ for design details and paving requirements <br /> inches of Mix Asphalt (HMA) <br /> Bituminous Surface Treatment (BST), also known as chipseal <br /> inches Crushed Surfacing Top Course (CSTC) <br /> inches Crushed Surfacing Base Course (CSBC) <br /> inches of Rock Cap <br /> Geotextile for separation or soil stabilization <br />6.Gravel Access Connection <br />The Access Connection shall be constructed with the following materials, listed from top lift to bottom lift. The <br />thicknesses shown are minimum requirements. WSDOT may require additional material as necessary to <br />properly construct the access connection. <br /> See Exhibit “ “ for additional desgin details and gravel requirements <br /> inches Crushed Surfacing Top Course (CSTC) <br /> inches Crushed Surfacing Base Course (CSBC) <br /> inches of Quarry Spalls <br /> inches of Rock Cap <br /> Geotextile for separation or soil stabilization <br />7.Culvert Installation <br />The access connection shall include the installation of a culvert installed in a straight line and with a grade <br />that matches the existing grade of the highway ditch or swale such that the existing conveyance of stormwater <br />will not be adversely impacted. The culvert to be installed shall be <br /> inch minimum diameter culvert <br />8.Culvert Beveled End Treatments <br />The open ends of the culvert run shall be beveled to match the existing slopes of the ditch or swale and <br />access connection fill material. <br />9.Culvert End Treatments – Quarry Spalls <br />Quarry spalls shall be placed around the open ends of the culvert. The quarry spalls shall be placed below, <br />along the sides, and on the top of the open end of the culvert for a minimum length of two (2) feet in all <br />directions. <br />10.Gated and Locked Access <br />This access connection shall be gated and locked when not in active use. <br />11.Surety <br />To ensure proper compliance with all terms and conditions of this permit, a surety amount in the form of <br />a Bond, Assignment of Escrow, Certificate of Deposit, Irrevocable Letter of Credit, Check or Money Order <br />shall be provided to WSDOT in the amount listed below. If a bond is provided, it shall be written by a surety <br />company authorized to do business in the State of Washington. <br />The surety amount shall be: <br />The surety bond shall remain in force until all work under this permit has received final concurrence by <br />WSDOT, and WSDOT issues a written release of the surety bond. <br />B <br />8 <br />10 <br />ACP 61716 SR-903 MP 3.45 R Page 2 of 3 Exhibit A <br />COPY