My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2026-0206 Cle Elum Transfer Station Project Manual
>
Meetings
>
2026
>
04. April
>
2026-04-07 10:00 AM - Commissioners' Agenda
>
2026-0206 Cle Elum Transfer Station Project Manual
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/2/2026 12:38:37 PM
Creation date
4/2/2026 12:23:36 PM
Metadata
Fields
Template:
Meeting
Date
4/7/2026
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Item
Request to Approve an Agreement for Services with Gibson and Son for the New Entrance and Tank Replacement at the Cle Elum Transfer Station
Order
4
Placement
Consent Agenda
Row ID
143218
Type
Agreement
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
365
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ITEM DESCRIPTION <br />YES NO <br />53. <br />Fencing materials <br />X <br />54. <br />Guide Posts <br />X <br />55. <br />Traffic Buttons <br />X <br />56. <br />Epoxy <br />X <br />57. <br />Cribbing <br />X <br />58. <br />Water distribution materials <br />X <br />59. <br />Steel "H" piles <br />X <br />60. <br />Steel pipe for concrete pile casings <br />X <br />61. <br />Steel pile tips, standard <br />X <br />62. <br />Steel pile tips, custom <br />X <br />Prefabricated items specifically produced for public works projects that are prefabricated in a <br />county other than the county wherein the public works project is to be completed, the wage for <br />the offsite prefabrication shall be the applicable prevailing wage for the county in which the actual <br />prefabrication takes place. <br />It is the manufacturer of the prefabricated product to verify that the correct county wage rates are <br />applied to work they perform. <br />See RCW 39.12.010 <br />(The definition of"locality" in RCW 39.12.010(2) contains the phrase "wherein the physical work is being performed." The department <br />interprets this phrase to mean the actual work site. <br />Supplemental to Wage Rates 8 <br />8/30/2025 Edition, Published August 13, 2025 <br />
The URL can be used to link to this page
Your browser does not support the video tag.