Laserfiche WebLink
2/6/26, 1:53 PM <br />Journey Level Wages <br />Painting and installing <br />lines, arrows, bumpers, <br />Traffic Control Stripers <br />curbs, etc., on parking <br />$95.41 <br />15L <br />lots, air fields, highways, <br />game courts (Group 1) <br />Preparation and <br />Traffic Control Stripers <br />maintenance of all <br />$95.41 <br />15L <br />surfaces (Group 1) <br />Seal coating, slurry <br />Traffic Control Stripers <br />coating and other surface <br />$55.54 <br />15L <br />protection (Group 2) <br />Asphalt Mix Over 20 <br />Truck Drivers <br />$62.45 <br />5D <br />Yards <br />Truck Drivers <br />Asphalt Mix To 20 Yards <br />$62.25 <br />5D <br />Truck Drivers <br />Dump Truck <br />$62.25 <br />5D <br />Truck Drivers <br />Dump Truck & Trailer <br />$62.45 <br />5D <br />Truck Drivers <br />Other Trucks <br />$62.14 <br />5D <br />Transit Mixers 20 yards <br />Truck Drivers - Ready Mix <br />$62.45 <br />5D <br />and under <br />Transit Mixers over 20 <br />Truck Drivers - Ready Mix <br />$62.79 <br />5D <br />yards <br />Well Drillers & Irrigation <br />Irrigation Pump Installer <br />$17.13 <br />Pump Installers <br />1K <br />1K <br />1K <br />1V 8M <br />1V <br />8M <br />1V <br />8M <br />1V <br />8M <br />1V <br />8M <br />1V 8M <br />1V 8M <br />1 <br />https://secure.Ini.wa.gov/wagelookup/rates/journey-level-rates 42/43 <br />