Laserfiche WebLink
2/6/26, 1:53 PM <br />Journey Level Wages <br />Installation of guard rail <br />and posts and similar <br />Traffic Control Stripers <br />$55.54 <br />15L <br />1K <br />protective devices (Group <br />2) <br />Installation of parking <br />gates, ticket spitters and <br />Traffic Control Stripers <br />other mechanical and <br />$55.54 <br />15L <br />1K <br />automatic control <br />devices (Group 2) <br />Installation of plastic <br />metal or composition <br />Traffic Control Stripers <br />$95.41 <br />15L <br />1K <br />button, or lines used <br />instead of paint (Group 1) <br />Line removal; chemical <br />Traffic Control Stripers <br />sand and hydro -blast, <br />$95.41 <br />15L <br />1K <br />paint and button (Group 1) <br />Manufacturing and <br />installation of all car stops <br />Traffic Control Stripers <br />and control devices and <br />$55.54 <br />15L <br />1K <br />similar traffic regulators <br />(Group 2) <br />Manufacturing, painting, <br />stenciling, servicing, <br />repairing, placing and <br />Traffic Control Stripers <br />removal of traffic safety <br />$55.54 <br />15L <br />1K <br />and control <br />devices/barricades <br />(Group 2) <br />https://secure.Ini.wa.gov/wagelookup/rates/journey-level-rates 41 /43 <br />