My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2026-0206 Cle Elum Transfer Station Project Manual
>
Meetings
>
2026
>
04. April
>
2026-04-07 10:00 AM - Commissioners' Agenda
>
2026-0206 Cle Elum Transfer Station Project Manual
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/2/2026 12:38:37 PM
Creation date
4/2/2026 12:23:36 PM
Metadata
Fields
Template:
Meeting
Date
4/7/2026
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Item
Request to Approve an Agreement for Services with Gibson and Son for the New Entrance and Tank Replacement at the Cle Elum Transfer Station
Order
4
Placement
Consent Agenda
Row ID
143218
Type
Agreement
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
365
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
KITTITAS COUNTY SOLID WASTE ON-CALL <br />CLE ELUM TRANSFER STATION FRONT ENTRANCE DESIGN <br />PW\JA\KITTCO02\ENTRANCE FILL AND BACKFILL <br />JUNE 2023 31 23 23 - 7 <br />©COPYRIGHT 2023 JACOBS <br />material is replaced as compacted earth fill. Coordinate with <br />Engineer in these zones. <br />3.05 PREPARED NATIVE SUBGRADE <br />A. Conform to requirements of Section 31 23 13, Subgrade Preparation. <br />3.06 FIELD QUALITY CONTROL TESTING <br />A. During fill and backfill activities, soil materials shall be verified for gradation <br />and placement thicknesses in conformance with these Specifications. <br />B. Testing requirements and locations shall be coordinated with (and approved <br />by) the Engineer. <br />C. For tests conducted in the field, Contractor shall make available test results to <br />the Engineer within 24 hours. If a sample is taken from the field and sent to a <br />laboratory for testing, Contractor shall make available test results to the <br />Engineer within 48 hours after the sample is taken in the field. <br />D. For Bidding purposes, the following minimum test schedule shall be assumed: <br />1. In-place density tests shall be made on the following minimum <br />schedule: <br />a. Subgrade Preparation: Ten per acre. <br />b. Trench Backfill: One per 250 linear feet per lift. <br />c. Gravel Bases for Slabs/Footing: Two per slab and one per footing <br />d. Roadways and Embankment Fill Areas: One per 250 linear feet <br />per lift. <br />2. Standard Proctor laboratory density curves (five-point minimum) shall <br />be submitted by Contractor for each imported material in accordance <br />with ASTM D698. Samples of native materials used for embankment <br />and backfill and additional samples of imported materials shall be taken <br />at locations requested by Engineer. <br />3.07 ROAD SURFACING AND BALLAST <br />A. Place and compact as specified in Section 32 11 23, Aggregate Base Courses. <br />END OF SECTION
The URL can be used to link to this page
Your browser does not support the video tag.