My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2026-0206 Cle Elum Transfer Station Project Manual
>
Meetings
>
2026
>
04. April
>
2026-04-07 10:00 AM - Commissioners' Agenda
>
2026-0206 Cle Elum Transfer Station Project Manual
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/2/2026 12:38:37 PM
Creation date
4/2/2026 12:23:36 PM
Metadata
Fields
Template:
Meeting
Date
4/7/2026
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Item
Request to Approve an Agreement for Services with Gibson and Son for the New Entrance and Tank Replacement at the Cle Elum Transfer Station
Order
4
Placement
Consent Agenda
Row ID
143218
Type
Agreement
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
365
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
KITTITAS COUNTY SOLID WASTE ON-CALL <br />CLE ELUM TRANSFER STATION FRONT ENTRANCE DESIGN <br />FILL AND BACKFILL PW\JA\KITTCO02\ENTRANCE <br />31 23 23 - 6 JUNE 2023 <br />©COPYRIGHT 2023 JACOBS <br />G. Settlement: Correct and repair any subsequent damage to structures, <br />pavements, curbs, slabs, piping, and other facilities, caused by settlement of <br />fill or backfill material. <br />3.02 BACKFILL UNDER AND AROUND STRUCTURES <br />A. Under Facilities: Within influence area beneath structures, slabs, pavements, <br />curbs, piping, conduits, duct banks, and other facilities, backfill with base <br />course, unless otherwise shown. Place base course in lifts of 6-inch maximum <br />thickness and compact each lift to minimum of 95 percent relative compaction <br />as determined in accordance with ASTM D698. <br />3.03 FILL <br />A. Outside Influence Areas beneath Structures, Pavements, Curbs, Slabs, Piping, <br />and Other Facilities: <br />1. Unless otherwise shown, place earthfill as follows: <br />a. Allow for 6-inch thickness of topsoil where required. <br />b. Maximum 8-inch thick lifts. <br />c. Place and compact fill across full width of embankment. <br />d. Compact to minimum 90 percent relative compaction in <br />accordance with ASTM D698. <br />e. Dress completed embankment with allowance for topsoil, crest <br />surfacing, and slope protection, where applicable. <br />3.04 REPLACING OVEREXCAVATED AND SUBEXCAVATED MATERIAL <br />A. Replace excavation carried below grade lines shown or established by <br />Engineer as follows: <br />1. Beneath Fill or Backfill: Same material as specified for overlying fill or <br />backfill. <br />2. Permanent Cut Slopes (Where Overlying Area is Not to Receive Fill or <br />Backfill): <br />a. Flat to Moderate Steep Slopes (3H:1V, Horizontal Run; Vertical <br />Run): Earthfill. <br />b. Steep Slopes (Steeper than 3H:1V): <br />1) Correct overexcavated or subexcavated zones by <br />transitioning between overcut areas and designed slope <br />adjoining areas, provided such cutting does not adversely <br />impact existing facilities, adjacent facility areas, or <br />completed Work. <br />2) Backfilling in these areas of steep slopes is restricted unless, <br />in Engineer’s opinion, backfill will remain stable, and
The URL can be used to link to this page
Your browser does not support the video tag.