My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2026-0206 Cle Elum Transfer Station Project Manual
>
Meetings
>
2026
>
04. April
>
2026-04-07 10:00 AM - Commissioners' Agenda
>
2026-0206 Cle Elum Transfer Station Project Manual
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/2/2026 12:38:37 PM
Creation date
4/2/2026 12:23:36 PM
Metadata
Fields
Template:
Meeting
Date
4/7/2026
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Item
Request to Approve an Agreement for Services with Gibson and Son for the New Entrance and Tank Replacement at the Cle Elum Transfer Station
Order
4
Placement
Consent Agenda
Row ID
143218
Type
Agreement
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
365
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
KITTITAS COUNTY SOLID WASTE ON-CALL <br />CLE ELUM TRANSFER STATION FRONT ENTRANCE DESIGN <br />FILL AND BACKFILL PW\JA\KITTCO02\ENTRANCE <br />31 23 23 - 4 JUNE 2023 <br />©COPYRIGHT 2023 JACOBS <br />PART 2 PRODUCTS <br />2.01 SOURCE QUALITY CONTROL <br />A. Gradation Tests: As necessary to locate acceptable sources of onsite or <br />imported material. <br />B. Final approval of aggregate material will be based on test results of installed <br />materials. <br />2.02 EARTHFILL <br />A. Excavated material from required excavations, free from rocks larger than <br />3 inches, from roots and other organic matter, ashes, cinders, trash, debris, and <br />other deleterious materials. <br />B. If shown beneath structures or pavements, shall have maximum 15 percent by <br />weight passing No. 200 sieve. <br />C. Provide imported material of equivalent quality, if required to accomplish <br />Work. <br />2.03 BACKFILL AROUND BURIED STRUCTURES <br />A. As specified for Base Course. <br />2.04 BASE COURSE <br />A. As specified in Section 32 11 23, Aggregate Base Courses. <br />2.05 TOP COURSE <br />A. As specified in Section 32 11 23, Aggregate Base Courses. <br />2.06 COMPACTION EQUIPMENT <br />A. Compaction equipment shall be of suitable type and adequate to obtain the <br />specified relative compaction, and shall provide satisfactory breakdown of <br />materials to form a dense and unyielding fill. <br />B. Compaction equipment shall be operated in strict accordance with the <br />manufacturer’s instructions and recommendations. Equipment shall be <br />maintained in such condition that it will deliver the manufacturer’s rated <br />compactive effort. If inadequate relative densities are obtained, larger and/or <br />different types of additional equipment shall be provided by the Contractor at
The URL can be used to link to this page
Your browser does not support the video tag.