My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2026-0206 Cle Elum Transfer Station Project Manual
>
Meetings
>
2026
>
04. April
>
2026-04-07 10:00 AM - Commissioners' Agenda
>
2026-0206 Cle Elum Transfer Station Project Manual
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/2/2026 12:38:37 PM
Creation date
4/2/2026 12:23:36 PM
Metadata
Fields
Template:
Meeting
Date
4/7/2026
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Item
Request to Approve an Agreement for Services with Gibson and Son for the New Entrance and Tank Replacement at the Cle Elum Transfer Station
Order
4
Placement
Consent Agenda
Row ID
143218
Type
Agreement
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
365
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
KITTITAS COUNTY SOLID WASTE ON-CALL <br />CLE ELUM TRANSFER STATION FRONT ENTRANCE DESIGN <br />PW\JA\KITTCO02\ENTRANCE FILL AND BACKFILL <br />JUNE 2023 31 23 23 - 3 <br />©COPYRIGHT 2023 JACOBS <br />1.03 SUBMITTALS <br />A. Action Submittals: Certified test results of all imported and processed material <br />from independent testing agency. <br />B. Informational Submittals: <br />1. Manufacturer’s data sheets for compaction equipment. <br />2. Certified results of in-place density tests from independent testing <br />agency. <br />1.04 QUALITY ASSURANCE <br />A. Notify Engineer when: <br />1. Structure is ready for backfilling, and whenever backfilling operations <br />are resumed after a period of inactivity. <br />2. Soft or loose subgrade materials are encountered wherever embankment <br />or site fill is to be placed. <br />3. Fill material appears to be deviating from Specifications. <br />1.05 SEQUENCING AND SCHEDULING <br />A. Complete applicable Work specified in Section 02 41 00, Demolition; <br />Section 31 10 00, Site Clearing; Section 31 23 16, Excavation; and <br />Section 31 23 13, Subgrade Preparation, prior to placing fill or backfill. <br />B. Backfill against concrete structures only after concrete has attained 70 percent <br />of design strength. Obtain Engineer’s acceptance of concrete work and <br />attained strength prior to placing backfill. <br />C. Backfill around buried structures only after structure is set in position, <br />securely anchored and ready to be backfilled. Engineer provides authorization <br />to backfill, and completion of satisfactory repairs to concretes, cracks, seams, <br />have been satisfactory completed. <br />D. Do not place fill materials until after subgrade has been prepared as specified <br />in Section 31 23 13, Subgrade Preparation.
The URL can be used to link to this page
Your browser does not support the video tag.