My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2026-0206 Cle Elum Transfer Station Project Manual
>
Meetings
>
2026
>
04. April
>
2026-04-07 10:00 AM - Commissioners' Agenda
>
2026-0206 Cle Elum Transfer Station Project Manual
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/2/2026 12:38:37 PM
Creation date
4/2/2026 12:23:36 PM
Metadata
Fields
Template:
Meeting
Date
4/7/2026
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Item
Request to Approve an Agreement for Services with Gibson and Son for the New Entrance and Tank Replacement at the Cle Elum Transfer Station
Order
4
Placement
Consent Agenda
Row ID
143218
Type
Agreement
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
365
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
KITTITAS COUNTY SOLID WASTE ON-CALL <br />CLE ELUM TRANSFER STATION FRONT ENTRANCE DESIGN <br />PW\JA\KITTCO02\ENTRANCE DEMOLITION <br />JUNE 2023 02 41 00 - 3 <br />©COPYRIGHT 2023 JACOBS <br />3.02 PROTECTION <br />A. Existing Work: <br />1. Survey the Site and examine Drawings and Specifications to determine <br />the extent of the Work before beginning any demolition activities. <br />2. Take necessary precautions to avoid damage to existing items scheduled <br />to remain in place, to be reused, or to remain the property of Owner; any <br />Contractor-damaged items shall be repaired or replaced as directed by <br />Engineer. <br />B. Protection of Personnel: During demolition, continuously evaluate the <br />condition of the pipes and excavation areas being demolished and take <br />immediate action to protect operating systems and existing landfill <br />components, including liner systems, in and around the demolition site. <br />3.03 BACKFILL <br />A. Do not use demolition debris as backfill material. <br />3.04 DISPOSITION OF MATERIAL <br />A. Do not remove equipment and materials without approval of Contractor’s <br />Demolition/Renovation Plan by Engineer. <br />END OF SECTION
The URL can be used to link to this page
Your browser does not support the video tag.