KITTITAS COUNTY SOLID WASTE ON-CALL <br />CLE ELUM TRANSFER STATION FRONT ENTRANCE DESIGN <br />TEMPORARY FACILITIES AND CONTROLS PW\JA\KITTCO02\ENTRANCE <br />01 50 00 - 6 JUNE 2023 <br />©COPYRIGHT 2023 JACOBS <br />3.02 PROTECTION OF WORK AND PROPERTY <br />A. General: <br />1. Perform Work within right-of-way and easements in a systematic <br />manner that minimizes inconvenience to property owners and the <br />public. <br />2. No residence or business shall be cut off from vehicular traffic for a <br />period exceeding 4 hours unless special arrangements have been made. <br />3. Schedule the Work so construction will not interfere with irrigation of <br />cultivated lands or pasturelands. Construction may proceed during <br />irrigation season, provided Contractor constructs temporary irrigation <br />ditches, turnouts, and miscellaneous structures acceptable to property <br />owners. <br />4. Maintain in continuous service existing oil and gas pipelines, <br />underground power, telephone or communication cable, water mains, <br />irrigation lines, sewers, poles and overhead power, and other utilities <br />encountered along line of the Work, unless other arrangements <br />satisfactory to owners of said utilities have been made. <br />5. Where completion of the Work requires temporary or permanent <br />removal or relocation of existing utility, coordinate activities with <br />owner of said utility and perform work to their satisfaction. <br />6. Protect, shore, brace, support, and maintain underground pipes, <br />conduits, drains, and other underground utility construction uncovered <br />or otherwise affected by construction operations. <br />7. Keep fire hydrants and water control valves free from obstruction and <br />available for use at all times. <br />8. In areas where Contractor’s operations are adjacent to or near a utility, <br />such as gas, telephone, television, electric power, water, sewer, or <br />irrigation system, and such operations may cause damage or <br />inconvenience, suspend operations until arrangements necessary for <br />protection have been made by Contractor. <br />9. Notify property owners and utility offices that may be affected by <br />construction operation at least 2 days in advance: Before exposing a <br />utility, obtain utility owner’s permission. Should service of utility be <br />interrupted due to Contractor’s operation, notify proper authority <br />immediately. Cooperate with said authority in restoring service as <br />promptly as possible and bear costs incurred. <br />10. Do not impair operation of existing sewer system. Prevent construction <br />material, pavement, concrete, earth, volatile and corrosive wastes, and <br />other debris from entering sewers, pump stations, or other sewer <br />structures. <br />11. Maintain original Site drainage wherever possible.