Laserfiche WebLink
Need backup to support the additional Absorbed by CCC. <br />labor. How are additional materials being P.o. Box I19 Wenatchee, WA98807 <br />added if maintaining the original grading? Phone: (509)662-7119 Fax:(509)662-4465 <br />tE: January 13, 202 <br />Genera(Contractars <br />ru__..L.._.. o...J.... �.,...., �........,........,...... oco rn rno Is t0 8 EA at gi7OO <br />wens urg ueo nm"a — pio each for tota o <br />Bid Items Quantitt Unit Unit Price Amount <br />1 RFP 02 - 1" Copper Water Service Piping & 3 Yard Hydrants 110 LF $ 175.00 $19,250.00 <br />RFP 02 - Flat Stair Pads & EA <br />Subtotal — <br />Subtotal —$3G;4SQ--W- <br />Total $39jA-:.rJoo <br />Qualifications: Please Read Carefully Revise TOTAL: $19,250 <br />1. Washington State Sales Tax has been not been included in proposal. <br />2. Prevailing Wage has been accounted for in proposal. <br />3. Rock excavation (i.e. Solid Rock, Caliche, Hard Pan, Cemented Sails and/or Boulders larger than 1 Cubic Yard) have not been included. Price Negotiation will be <br />required if these materials are encountered. <br />4. Over Excavation of Unsuitable Material has not been accounted for, price negotiation will be required if these materials are encountered. <br />S. Excludes Water System Support. <br />6. Exludes Construction Survey. <br />7. Engineering & Professional Surveying Services are Excluded. <br />8. Fees for Utilities, County, City, Etc. are not included. Cultural Resource Services are not covered in our scope. <br />9. Hazardous Materials Abatement, Removal, Handling, Disposal, etc. are not expected onsite and are therefore Excluded. <br />10. Watering & Dust Control are Included for Selland's scope of work and duration only. No OT Dust Control or beyond our work. <br />11. Erosion Control Inspections, Reporting, Monitoring & Maintenance are Excluded. Stormwater Permit by others. <br />12. Dust control has been provided while we are actively working the site. No permanent or sustained dust control or mitigation has been included. <br />13. Any scope of work not specifically included as a line item in this proposal is excluded. <br />14. Actual quantities installed shall be tracked/measured and the basis of payment at the unit prices included in this proposal unless otherwise agreed. <br />15. Due to global supply chain disruptions and market volatility we reserve the exclusive right to adjust our proposal for material escalation. <br />16. Proposal is valid for 30 days. This proposal shall be made part of any subcontract. <br />If you have any questions or need additional information with regard to our proposal please give us a call. <br />Sincerely, Regarding Flat Stair Pads: Because the stadium contractor needs each of the stair pad ares to <br />SELLAND CONSTRUCTION, INC. be perfectly flat with no allowable variance, the added cost is for laborers to hand grade each <br />peA area and enSUF8 they aFe PeFfeeily flat. This is going to take more time and labor <br />throughout the concourse slab than originally anticipated from the bid diocuments. <br />Ron Zerr III <br />(50 ) 961.7R2 <br />Where is this coming <br />from? Flatwork shall <br />conform to the <br />requirements of the <br />specifications with <br />regard to tolerance. <br />Would be more cost effective to pour <br />extra concrete at landings with gravel <br />grading consistent through out. <br />Yes, thank you. Pricing <br />Confrimed. revised to reflect this. <br />What is add for then? <br />;!, 11 <br />Page 1 of 1 <br />