My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Change Order 06_ALSC Signed
>
Meetings
>
2026
>
03. March
>
2026-03-17 10:00 AM - Commissioners' Agenda
>
Change Order 06_ALSC Signed
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/12/2026 1:36:23 PM
Creation date
3/12/2026 1:35:55 PM
Metadata
Fields
Template:
Meeting
Date
3/17/2026
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Item
Request to Approve Chair Signature on Change Order No. 6 for the Rodeo Arena Seating Project
Order
11
Placement
Consent Agenda
Row ID
142644
Type
Agreement
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
23
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
t <br />P.O. Box 119 Wenatchee, WA 98807 <br />Phone: (509)662-7119 Fax: (509)662-4465 <br />Bid Items Quantity Unit Unit Price Amount <br />1 Utility Trench Exc. & BF 40 LF 80.00$ $3,200.00 <br />2 Vault Exc. & BF 1 EA 3,730.00$ $3,730.00 <br />3 Furnish & Install Eco Blocks 4 EA 234.00$ $936.00 <br />$7,866.00 <br />$7,866.00 <br />Qualifications: Please Read Carefully <br />1. Washington State Sales Tax has been not been included in proposal. <br />2. Prevailing Wage has been accounted for in proposal. <br />3. Any scope of work not specifically included as a line item in this proposal is excluded. <br />4. <br />5. <br />6. <br /> <br />Sincerely, <br />SELLAND CONSTRUCTION, INC. <br />James Flowers <br />(509) 881-0339 <br />Subtotal <br />Actual quantities installed shall be tracked/measured and the basis of payment at the unit prices included in this proposal unless otherwise agreed. <br />Due to global supply chain disruptions and market volatility we reserve the exclusive right to adjust our proposal for material escalation. <br />Proposal is valid for 30 days. This proposal shall be made part of any subcontract. <br />Total <br />If you have any questions or need additional information with regard to our proposal please give us a call. <br />Bid Date: January 26, 2026 <br />Ellensburg Rodeo Arena Improvements - City Electrical Trenching & BF COP <br />SELLAND <br />INC. <br />CONSTRUCTION <br />General Contractors <br />Page 1 of 1
The URL can be used to link to this page
Your browser does not support the video tag.