Laserfiche WebLink
PROPOSAL <br />P.O. Box 119 <br />Wenatchee, WA. 98807-0119 <br />Phone 509-662-7119 <br />Fax 509-662-6380 <br />To:PROJECT:Ellensburg Rodeo Arena Improvements <br />Kittitas County Comissioners COP#19 <br />205 West 5th Ave, Suite 108 DATE:March 9, 2026 <br />Ellensburg, WA 98926 TITLE:Electrical Utility Plans Rev.1 <br />Date DESCRIPTION QUANITITY UOM UNIT PRICE AMOUNT <br />3/9/2026 <br />1 LS 18,666.00$ $7,866.00 <br />1 LS 33,366.00$ $7,814.00 <br />940.80 <br />16,620.80 <br />3/9/2026 <br />8 HR 128.18$ $1,025.44 <br />0 WD 925.00$ $0.00 <br />4 HR 161.54$ $646.16 <br />4 HR 116.25$ $465.00 <br />0 HR 63.08$ $0.00 <br />0 HR 119.00$ $0.00 <br />320.49 <br />2,457.09 <br />19,077.89 <br />$181.24 <br />$267.09 <br />19,526.22 <br />3/9/2026 <br />-2 HR 81.78$ ($163.56) <br />-2 CY 250.00$ ($500.00) <br />(663.56) <br />18,862.66 <br />MAKE CHECKS PAYABLE TO: <br />Cascade Central Construction, LLC <br />P.O Box 119 <br />Wenatchee, WA. 98807-0119 <br />THANK YOU FOR YOUR BUSINESS! <br />Subcontractor Cost <br />Earthwork Subcontractor - See attached Back-up <br />Electrical Subcontractor - See attached Back-up <br />General Contractor - Sub Total <br />Subcontractor - Sub Total <br />Cascade Central Construction Cost <br />Project Management & Coordination <br />Laborer <br />Carpenter <br />6% Mark-up <br />Supervision <br />General Conditions <br />15% Mark-up <br />Concrete Encasement Credit Per RFI 052 Response <br />Subtotal <br />Bond <br />B&O Tax <br />Project Engineer <br />Subtotal <br />TOTAL <br />Qualifications: <br />Included: <br />-Excavation and backfill for duct, vault, transformer, primary conductors, and trench from meter cabinet to to new transformer. <br />-Ecology Blocks <br />-Conduit and wire from meter cabinet to new transformer. <br />Excluded: <br />-By utility provider: All removal and demo. Supply and install of duct, vault, transformer, and primary conductors/conduit. <br />-Concrete encasement from meter cabinet to utility tranformer vault <br />-Utility fees. <br />Schedule impact: None. Excluding any potential lead times or scheduling associated with utility scope of work. <br />Cement Mason <br />Concrete <br />Subtotal