Laserfiche WebLink
BELSAAS & SMITH CONSTRUCTION <br />SHEET 2 of 2 C.O.P. #17 <br />CHANGE ORDER PROPOSAL BREAKDOWN SHEET <br />EQUIP SUB MATERIAL LABOR <br />COST COST COST COST <br />TOTALS FROM PREVIOUS PAGE -$ 2,626.40$ 5,291.00$ 16,850.00$ <br />OVERHEAD 3%-$ 78.79$ 158.73$ 505.50$ <br />PROFIT 10%-$ 270.52$ 544.97$ 1,735.55$ <br />BONDING 1.5%-$ 44.64$ 89.92$ 286.37$ <br />SUB TOTAL -$ 3,020.35$ 6,084.62$ 19,377.42$ <br />SUB TOTAL -$ 3,020.35$ 6,084.62$ 19,377.42$ <br />LABOR 19,377.42$ <br />MATERIAL 6,084.62$ <br />EQUIPMENT -$ <br />SUBCONTRACTORS 3,020.35$ <br />SUB TOTAL SUB TOTAL 28,482.39$ <br />PREVIOUS CO ALLOWANCE <br />GRAND TOTAL TOTAL 28,482.39$ <br />TIME EXTENTION REQUIRED: <br />NOTICE TO PROCEED REQUIRED BY: <br />WE RESERVE OUR RIGHTS UNDER THE CONTRACT TO ACCESS THIS CHANGE <br />CUMULATIVELY AS IT AFFECTS TIME AND AMOUNT. <br />Docusign Envelope ID: 26606B8A-3971-4833-8797-9B3D812FDC06