Laserfiche WebLink
BELSAAS & SMITH CONSTRUCTION <br />SHEET 1 of 2 C.O.P. #17 <br />CHANGE ORDER PROPOSAL BREAKDOWN SHEET <br />UNIT COSTS EQUIP SUB MATERIAL LABOR <br />#DESCRIPTION QUAN.UNIT Mat.EQUIP LABOR COST COST COST COST <br />Probabtion Office <br />General Conditions 1 LS 3,500.00 -$ -$ -$ 3,500.00$ <br />-$ -$ -$ -$ <br />Demo and Dispoal 1 LS 1,200.00 -$ -$ -$ 1,200.00$ <br />-$ -$ -$ -$ <br />Framing 1 LS 3,500.00 -$ -$ -$ 3,500.00$ <br />-$ -$ -$ -$ <br />Drywall 1 LS 2,500.00 -$ -$ -$ 2,500.00$ <br />-$ -$ -$ -$ <br />Paint 1 LS 2,750.00 -$ -$ -$ 2,750.00$ <br />-$ -$ -$ -$ <br />Insulation 1 LS 200.00 -$ -$ 200.00$ -$ <br />-$ -$ -$ -$ <br />Doors and Hardware 1 LS 2,200.00 850.00 -$ -$ 2,200.00$ 850.00$ <br />-$ -$ -$ -$ <br />Door and Trim Stain 1 LS 1,800.00 -$ -$ -$ 1,800.00$ <br />-$ -$ -$ -$ <br />Security Glass 1 LS 2,891.00 -$ -$ 2,891.00$ -$ <br />-$ -$ -$ -$ <br />Carpentry 1 LS -$ 2,626.40$ -$ -$ <br />-$ -$ -$ -$ <br />Cleaning 1 LS 750.00 -$ -$ -$ 750.00$ <br />-$ -$ -$ -$ <br />-$ -$ -$ -$ <br />-$ -$ -$ -$ <br />-$ -$ -$ -$ <br />-$ -$ -$ -$ <br />-$ -$ -$ -$ <br />-$ -$ -$ -$ <br />-$ -$ -$ -$ <br />-$ -$ -$ -$ <br />*TOTALS -$ 2,626.40$ 5,291.00$ 16,850.00$ <br />Docusign Envelope ID: 26606B8A-3971-4833-8797-9B3D812FDC06