Laserfiche WebLink
2026 Maintenance Rock Materials <br />Bid Opening February 19, 2026, at 2:00 p.m. <br />SCHEDULE'B' <br />Vendor to Provide Labor and Equipment to Load Materials <br />Ellensburg Cement Products <br />'13.15 900.00 <br />$105,200.00 <br />$85,475.00 <br />$59,150.00 <br />$27,040.00 <br />$45,800.00 <br />$45,800.00 <br />$11,150.00 <br />$11,150.00 <br />$22,500.00 <br />$22.500.00 <br />$10,900.00 <br />$10,900.00 <br />$536.465.00 <br />$13.15 <br />$13.15 <br />$16.90 <br />$16.90 <br />$'11.45 <br />$11.45 <br />$11.15 <br />$11.15 <br />$11.25 <br />$11.25 <br />$10.90 <br />$10.90 <br />BST Crushed Surfacino 1/2 to No. 4 <br />BST Crushed Surfacinq 1i2 to No. 4 <br />BST Crushed Surfacing 1/2 to No. 4 <br />BST Crushed Surfacing 3/8 to No. 10 <br />BST Crushed Surfacinq 3/8 to No. 10 <br />Maintenance Sand <br />Maintenance Sand <br />1 1/4" Crushed Surfacing Base <br />Course <br />1 1/4" Crushed Surfacing Base <br />Course <br />5i8" Crushed Surfacing Top Course <br />5/8" Crushed Surfacinq Too Course <br />21l2" Ballasl <br />2112" Ballasl <br />Total Schedule "B" - <br />Ellensburg <br />East Kittitas <br />CIe Elum <br />Ellensburg <br />Cle Elum <br />Ellensburq <br />Cle Elum <br />Ellensburg <br />Cle Elum <br />Ellensburg <br />Cle Elum <br />Ellensburg <br />Cle Elum <br />6,000 <br />8,000 <br />6,500 <br />3,500 <br />1,600 <br />4,000 <br />4,000 <br />1,000 <br />1,000 <br />2,000 <br />2,OOO <br />1,000 <br />1,000 <br />,rql f.Ht! <br />1 <br />2 <br />3 <br />4 <br />5 <br />o <br />7 <br />8 <br />9 <br />10 <br />11 <br />12 <br />13 <br />SCHEDULE "B"