Laserfiche WebLink
2026 Maintenance Rock Materials <br />Bid Opening February 19,2026 at 2:00 p.m. <br />SCHEDULE'A' <br />County to Provide Labor and Equipment to Load Materials <br />Ellensburg Gement Products <br />I <br />PR|CE PERTON I TOTAL PRTCE <br />$85,560.00 <br />$99,200.00 <br />$49,600.00 <br />$56,525.00 <br />$16,150.00 <br />$43,000.00 <br />$43,000.00 <br />$10,400.00 <br />$10,400.00 <br />$21,000.00 <br />$21,000.00 <br />$10,150.00 <br />$10,150.00 <br />$476,135.00 <br />$12.40 <br />$12.40 <br />$12.40 <br />$16.15 <br />$16.15 <br />$10.75 <br />$10.75 <br />$10.40 <br />$10.40 <br />$10.50 <br />$10.50 <br />$10.15 <br />$10.15 <br />ITEM DESCRIPTION <br />BST Crushed Surfacinq 1/2 to No. 4 <br />BST Crushed Surfacing 1/2 to No. 4 <br />BST Crushed Surfacing 1/2 to No. 4 <br />BST Crushed Surfacinq 3/8 to No. 10 <br />BST Crushed Surfacing 3/B to No. 10 <br />Maintenance Sand <br />Maintenance Sand <br />1 1/4" Crushed Surfacing Base Course <br />1 1i4" Crushed Surfacing Base Course <br />5/S" Crushed Surfacing Top Course <br />5/8" Crushed Surfacing Top Course <br />2112" Ballast <br />2112" Ballasl <br />TotalSchedule "A" - <br />Locatlon <br />Ellensburg <br />East Kittitas <br />Cle Elum <br />Ellensburg <br />Cle Elum <br />Ellensburg <br />Cle Elum <br />Ellensburg <br />Cle Elum <br />Ellensburg <br />Cle Elum <br />Ellensburg <br />Cle Elum <br />ESNMATED <br />QUANTITY <br />(ln TONS) <br />6,900 <br />8,000 <br />4,000 <br />3,500 <br />1,000 <br />4,000 <br />4,000 <br />'t,000 <br />1,000 <br />2,000 <br />2,000 <br />1.000 <br />1,000 <br />ITEM <br />NO. <br />I <br />2 <br />3 <br />4 <br />5 <br />6 <br />7 <br />8 <br />9 <br />10 <br />11 <br />12 <br />13 <br />SCHEDULE "A"