Laserfiche WebLink
BELSAAS & SMITH CONSTRUCTION <br />SHEET 2 of 2 C.O.P. #18 <br />CHANGE ORDER PROPOSAL BREAKDOWN SHEET <br />EQUIP SUB MATERIAL LABOR <br />COST COST COST COST <br />TOTALS FROM PREVIOUS PAGE -$ -$ 2,000.00$ 4,082.00$ <br />OVERHEAD 3%-$ -$ 60.00$ 122.46$ <br />PROFIT 10%-$ -$ 206.00$ 420.45$ <br />BONDING 1.5%-$ -$ 33.99$ 69.37$ <br />SUB TOTAL -$ -$ 2,299.99$ 4,694.28$ <br />SUB TOTAL -$ -$ 2,299.99$ 4,694.28$ <br />LABOR 4,694.28$ <br />MATERIAL 2,299.99$ <br />EQUIPMENT -$ <br />SUBCONTRACTORS -$ <br />SUB TOTAL SUB TOTAL 6,994.27$ <br />PREVIOUS CO ALLOWANCE <br />GRAND TOTAL TOTAL 6,994.27$ <br />TIME EXTENTION REQUIRED: <br />NOTICE TO PROCEED REQUIRED BY: <br />WE RESERVE OUR RIGHTS UNDER THE CONTRACT TO ACCESS THIS CHANGE <br />CUMULATIVELY AS IT AFFECTS TIME AND AMOUNT. <br />Docusign Envelope ID: 0123E2C2-BCDE-488E-A1A9-969064FBB3CE