Laserfiche WebLink
BELSAAS & SMITH CONSTRUCTION <br />SHEET 1 of 2 C.O.P. #18 <br />CHANGE ORDER PROPOSAL BREAKDOWN SHEET <br /> UNIT COSTS EQUIP SUB MATERIAL LABOR <br /># DESCRIPTION QUAN. UNIT Mat. EQUIP LABOR COST COST COST COST <br />Dishwashing Splash <br />Stainless Steel Backsplash 1 LS 2,000.00 2,450.00 -$ -$ 2,000.00$ 2,450.00$ <br />-$ -$ -$ -$ <br /> Demo and Finishes 1 LS 1,632.00 -$ -$ -$ 1,632.00$ <br />-$ -$ -$ -$ <br />-$ -$ -$ -$ <br />-$ -$ -$ -$ <br />-$ -$ -$ -$ <br />-$ -$ -$ -$ <br />-$ -$ -$ -$ <br />-$ -$ -$ -$ <br />-$ -$ -$ -$ <br />-$ -$ -$ -$ <br />-$ -$ -$ -$ <br />-$ -$ -$ -$ <br />-$ -$ -$ -$ <br />-$ -$ -$ -$ <br />-$ -$ -$ -$ <br />-$ -$ -$ -$ <br />-$ -$ -$ -$ <br />-$ -$ -$ -$ <br />-$ -$ -$ -$ <br />-$ -$ -$ -$ <br />-$ -$ -$ -$ <br />-$ -$ -$ -$ <br />-$ -$ -$ -$ <br />-$ -$ -$ -$ <br />-$ -$ -$ -$ <br />-$ -$ -$ -$ <br />-$ -$ -$ -$ <br />-$ -$ -$ -$ <br />* TOTALS -$ -$ 2,000.00$ 4,082.00$ <br />Docusign Envelope ID: 0123E2C2-BCDE-488E-A1A9-969064FBB3CE