My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Staff Report_Airport WSDOT_Grant_Match
>
Meetings
>
2026
>
03. March
>
2026-03-03 10:00 AM - Commissioners' Agenda
>
Staff Report_Airport WSDOT_Grant_Match
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/26/2026 1:29:49 PM
Creation date
2/26/2026 1:27:27 PM
Metadata
Fields
Template:
Meeting
Date
3/3/2026
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Item
Request to Approve a Resolution Authorizing the Public Works Director Submittal of Airport Aid Application to Washington State Department of Transportation Aviation Division for Bowers Field Improvement Projects
Order
15
Placement
Consent Agenda
Row ID
142099
Type
Resolution
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
66
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
J-U-B Agreement for Professional Services <br />Attachment 1A – Detailed Scope of Work Page 6 <br />Pavement Analysis, Geotechnical Investigation Report, Concept Taxilane Layout, and Construction <br />Cost Estimate and Schedule. <br /> Conduct in-house quality control/quality assurance review of preliminary design documents. <br /> Participate in a preliminary design review meeting with the CLIENT. Anticipate one (1) review <br />meeting with the CLIENT at the Airport, attendance by the Project Manager and Airport Engineer. <br />Review design philosophy, preliminary design drawings, design analysis and project schedules <br />with the CLIENT. <br /> Prepare and submit one (1) FAA Form 7460 to airspace the project construction equipment and <br />permanent taxiway geometry. <br /> Submit preliminary documents to FAA (1 copy) and CLIENT (2 copies) for approval. <br /> Task 003: Final Design Phase <br /> Finalize Bidding and Construction Contract Documents and Technical Specifications based on <br />Peer, CLIENT, and FAA Reviews. <br /> Finalize Design Plans based on Peer, CLIENT, and FAA Reviews. <br /> Prepare final Construction Safety and Phasing Plan to accommodate varying work components <br />that need to meet prescribed schedules. <br /> Complete final quantity calculations and prepare Final Engineer’s Opinion of Probable Construction <br />Cost Estimate. <br /> Prepare final Engineer’s Design Report based on Peer, CLIENT, and FAA Reviews. <br /> Submit final documents to FAA (1 copy) and CLIENT (2 copies) for approval. <br /> Task 004: Bidding Phase <br /> Administer the public bid advertisement process including bid document reproduction and <br />distribution of documents to plan rooms, contractors and suppliers. Submit advertisements to <br />appropriate newspaper(s) and trade magazines as required for publication. Maintain a “bidders <br />list” and distribute plans as requested. Fees for Plan & Specification Reproduction shall be reflected <br />in the “Printing” line below. <br /> Provide Pre-Bid Conference coordination to familiarize bidders and interested parties with the <br />construction project scope and requirements. Prepare a detailed agenda and displays, prepare <br />and issue conference minutes. It is anticipated that J-U-B will conduct this meeting at the Airport. <br /> Prepare Bid Addendums. Addenda are normally required in response to Contractor questions <br />and/or design changes initiated by the CLIENT and/or the FAA. Engineering estimate includes <br />costs for the preparation of two Addendums. <br /> Respond to questions that arise during the Contractor’s or supplier’s bid preparation process. <br /> Assist the CLIENT in conducting the project Bid Opening as required, including preparation of a <br />Project Bid Summary. It is anticipated that J-U-B will coordinate and attend this meeting at Kittitas <br />County Public Works Office. <br /> Prepare detailed Bid Tabulations documenting bid results and submit to CLIENT and the FAA. <br /> Assist the CLIENT with review and analysis of bids received. J -U-B will determine his opinion on <br />“responsiveness” of bid submittal. Provide letter of recommendation of award along with price/cost <br />analysis in accordance with FAA Order 5100.38D-Appendix U to CLIENT. Advise the CLIENT of <br />possible action in cases where bids exceed budget for the work to be performed by the Contractor. <br /> Subtask 005: Project Closeout Phase <br /> Prepare the final project report and close-out documents according to FAA requirements and <br />submit to CLIENT and FAA.
The URL can be used to link to this page
Your browser does not support the video tag.