Laserfiche WebLink
TITAN <br />V5,39.941.e.30b IIIANEL877RD <br />TO: Riley Eres <br />Contractor Belsaas & Smith Construction <br />FROM: Adam Rieker <br />Subcontractor Titan Electrical LLC <br />CHANGE TITLE I Transfer Building Mister Pump <br />COST IS TO: <br />Project: Lower Valley Transfer Station <br />2603 Green Ave <br />Ellensburg, WA 98926 <br />Subcontract# <br />Date: <br />11 /12/2025 <br />Change # <br />17 <br />Amount: <br />$543.58 <br />Initiated By: <br />Titan Electrical <br />Reason: <br />Design Change <br />Type: <br />Additive - Lump Sum <br />Provide circuitry from panel PP-T to the mister pump for the Transfer Building. The electrical plans do not <br />include any circuitry for the pump, and it was discovered recently that a 208-volt 20-amp circuit was <br />necessary. The cost includes the circuit breaker, 12/2 MC cable, boxes/fittings, receptacle, labor, and <br />O&P. <br />Credit Breakdown This Change: <br />Labor <br />$326.60 <br />Material <br />$126.38 <br />Other <br />O&P <br />$90.60 <br />Total <br />$543.58 <br />Authorized By: Titan Electrical LLC Accepted By: <br />SUBCONTRACTOR <br />Signature: <br />Signature: <br />Print Name: <br />Adam Rieker <br />Print Name: <br />Title: <br />Project Manager <br />Title: <br />Date: <br />11 /12/2025 <br />Date: <br />CONTRACTOR <br />Page 1 of 1 <br />