My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2026-01-13-minutes-solid-waste-and-maintenance
>
Meetings
>
2026
>
03. March
>
2026-03-03 10:00 AM - Commissioners' Agenda
>
2026-01-13-minutes-solid-waste-and-maintenance
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/26/2026 1:46:28 PM
Creation date
2/26/2026 1:27:11 PM
Metadata
Fields
Template:
Meeting
Date
3/3/2026
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Item
Approve Minutes
Order
1
Placement
Consent Agenda
Row ID
142099
Type
Minutes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
193
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Material: 14ga steel plate, 1 " angle, bolts for slotted holes <br />Labor: Onsite, installation of plates and angle with slotted holes'' 1 6, 6- 1 <br />Shop, Cut and drill sheet and angle with slotted holes _ _ � I lopper gusset eonstructim, ehanges and additional sfflau gussets. ever att <br />dirrensions and quantity of vvelded gusset piates with f[at bar perimeter have ehanged and <br />„ - — -I <br />piate and fiat bar, 3/8 <br />- Hopper framing.oanged from 3x3 sq tube to 4x4 sq tube and added weld layout. <br />�. ,.,,;� �, ., .r o- c,,lh..,c;� i �� PER 0_5001, SHOP DRAWINGS ARE REVIEWED FOR GENERAL CONFORMANCE WITH THE <br />1-1ulI i g'u11 0r; JIVIIJ:-VU/J11 <br />DESIGN CONCEPT. REVIEW OF SUBMITTALS DOES NOT CONSTITUTE APPROVAL OF <br />Mlaa.. <br />La.r.qu.'a1a. • A "+Ube+28M ; � DEVIATION FROM THE CONTRACT DOCUMENTS. ADDITIONALLY, SEE SNIP BELOW <br />i -r <br />PERTAINING TO CONFLICTS WITH THE CONTRACT DOCUMENTS. <br />1 .. L... rl.-...+'. C.. <br />L. a b o 1: V I I J l l V, I U V I I V U 11'l%1't'r7"I'(9L'l',i'I- l u t J'I L�i"l`ii'r`C9` <br />This is noted and changes <br />eh n ++; , �,r h n,ri;� �_ .,r , , , r �i +_._.-a ,� , made to com <br />C op, vut in-Ullll-9'IUIlulll'I�,� llVlIIL/Vullu UIIsll'i�"r171'r"lam-q -C;pG p Y <br />e <br />See Submittal 62, price change based on approved shop clans. Material price and labor <br />corrected. <br />- Hopper transition, 12x3/4 plates with rebar and stud\hve ll�een requested to be fully <br />welding both sides along length of opening into hopper. Submitf\a1�62 <br />Labor: Onsite welding. IT IS OUR UNDERSTANDING THAT THIS ITEM REFERS TO THE CONTRACTOR <br />FABRICATING 4x4 STRUTS INSTEAD OF 30, AND THAT NO 3X3 STRUTS WERE <br />FABRICATED. CAN YOU CONFIRM WHETHER USING A 44 INSTEAD OF A 3x3 WOULD <br />^,D�' 40 HOURS OF LABOR? <br />1. Fabrication increases <br />Due to engineering discrepancies and differences between original bid documents <br />and current plans, there have been multiple changes in shop drawings at request of <br />engineers as multiple detail callouts were not possible to perform or material non- <br />existent. <br />2. Mobile Welding increases <br />Due to no clarification and/or changes on original bid documents, due to engineers <br />request to meet standards with construction and steel, <br />SUBMITTALS <br />Shop drawings and material submittals shall be submitted to the Architect and SER prior to any fabrication or <br />construction for the following structural items. Submittals shall include one reproducible and one copy; <br />reproducible will be marked and returned, if deviations, discrepancies, or conflicts between shoo drawings <br />submittals and the contract documents are discovered either prior to or after shoo drawina submittals are <br />processed by the SER, the Contract Documents control and shall be followed. <br />
The URL can be used to link to this page
Your browser does not support the video tag.